1631 Woodland Ave
Austin, TX 78741
Two windows to be replaced at 1631 Woodland Ave
A City of Austin permit filed December 1, 2025, indicates that two windows at 1631 Woodland Ave will be replaced like for like. The permit is listed as final.
Summarized from City of Austin records · updated Dec 1, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 1, 2025
- since Dec 1, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress: replace 2 windows (like for like)
- AppliedNov 3, 2025
- IssuedDec 1, 2025
- WorkDec '25 – Jan '26
- Final inspectionJan 9, 2026
Passed final inspection Jan 9, 2026.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectExpress: replace 2 windows (like for like)
Express: replace 2 windows (like for like)
City of Austin permitBuilding PermitFinal- Record
- 2025-141872 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1631 Woodland Ave
What is being built at 1631 Woodland Ave?
The permit records a like-for-like replacement of two windows, not a new building. The City of Austin permit was filed December 1, 2025.
What work is planned at 1631 Woodland Ave near Bradford Alan Legacy Holdings?
A City of Austin permit indicates that two windows will be replaced like for like. The nearby landmark listed is Bradford Alan Legacy Holdings, at 1833 S I-35 Frontage Rd.
When was the window permit filed for 1631 Woodland Ave?
The permit was filed December 1, 2025. Its permit number is 2025-141872 BP.
Is the permit for 1631 Woodland Ave final?
Yes. The City of Austin lists permit 2025-141872 BP as final.
How many windows are being replaced at 1631 Woodland Ave?
The permit description specifies two windows, replaced like for like.
Also being built nearby
All of 78741- 1627 Woodland AveMar 26, 2026Interior non-structural demolition -non-load-bearing walls celling and floor · 74 m away
- 1703 Woodland AveOct 30, 2025Repair to broken sewer line under home approx 15ft in via tunnel · 79 m away
- 1704 Deerfield DrJun 3, 2026Tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc. there will be two access holds in front and back the house · 83 m away
- 1700 Woodland AveAug 8, 2014Good shepherd on the hill · 89 m away
- 1702 Woodland AveFeb 13, 2024Replacement of an existing gas water heater · 91 m away
- 1810 Matagorda StDec 1, 2023Replacement of complete existing central heat and air system with or without duct work · 95 m away
- 1703 Deerfield DrNov 21, 2024Change out water heater to existing residence · 108 m away
- 1705 Deerfield DrDec 9, 2024(ochoa gabriel) - installation of circuit for elec. vehicle charging station - esip · 119 m away
- 1700 Sylvan DrMar 22, 2024Express: replace windows tub to shower conversion kitchen cosmetic update new flooring new siding repair foundation · 121 m away
- 1708 Deerfield DrJun 1, 2026Replacement of complete existing central heat and air system with or without duct work · 128 m away
- 1829 IH 35 SvrdJun 18, 2024Woodland on ih 35 · 134 m away
- 1833 S I-35 Frontage Rd · Bradford Alan Legacy HoldingsApr 30, 2026Bonilla law firm — renovation/alteration — interior renovation of space with exterior facade renovation. no change in area · 149 m away