1702 Mariposa Dr

Austin, TX 78741

Electrical service conversion at 1702 Mariposa Dr

An electrical permit indicates work to convert the existing three-phase service to a single-phase, 200-amp system at 1702 Mariposa Dr. The City of Austin issued permit 2026-037852 EP on April 1, 2026; the permit is marked final.

Summarized from City of Austin records · updated Apr 1, 2026

Projects
1
1 filings
Latest filing
Apr 1, 2026
since Apr 1, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

Convert current three phase system down to a single phase 200 a. this includes replacing the riser weather head conductors meter can and gutter system

  1. AppliedMar 30, 2026
  2. IssuedApr 1, 2026
  3. WorkApr '26 – Apr '26
  4. Final inspectionApr 14, 2026

Passed final inspection Apr 14, 2026.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Convert current three phase system down to a single phase 200 a. this includes replacing the riser weather head conductors meter can and gutter system

    Convert current three phase system down to a single phase 200 a. this includes replacing the riser weather head conductors meter can and gutter system

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1702 Mariposa Dr

What work is happening at 1702 Mariposa Dr?

A City of Austin electrical permit describes converting the existing three-phase electrical system to a single-phase, 200-amp service. The work includes replacing the riser, weather head, conductors, meter can and gutter system.

Was a building permitted at 1702 Mariposa Dr?

The available record is for electrical work, not a new building. It is City of Austin permit 2026-037852 EP, issued April 1, 2026.

When was the electrical permit filed for 1702 Mariposa Dr?

The City of Austin record is dated April 1, 2026. Permit 2026-037852 EP is marked final.

What does permit 2026-037852 EP cover?

It covers converting the existing three-phase service to a single-phase, 200-amp system and replacing several service components, including the meter can and conductors.

Is 1702 Mariposa Dr getting a new electrical service?

The permit describes changes to the existing electrical system, including a conversion to single-phase, 200-amp service. It does not describe a new building.