1809 Sylvan Dr
Austin, TX 78741
Foundation and drain-line repairs at 1809 Sylvan Dr
Austin permits filed May 26 and May 28, 2026, cover repairs at the house at 1809 Sylvan Dr. The work includes installing 16 exterior pilings for foundation repair and excavating a tunnel to repair the main drain line beneath the house.
Summarized from City of Austin records · updated May 28, 2026
- Projects
- 2
- 2 filings
- Latest filing
- May 28, 2026
- since May 26, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress: foundation repair - installing 16 exterior pilings
- AppliedMay 28, 2026
- IssuedMay 28, 2026
- WorkMay '26 – Jul '26
- Final inspectionJul 9, 2026
Passed final inspection Jul 9, 2026.
2 contacts on this project · 2 phone numbers
Permit & project history
2 projectsExpress: foundation repair - installing 16 exterior pilings
Express: foundation repair - installing 16 exterior pilings
City of Austin permitBuilding PermitFinal- Record
- 2026-067384 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Excavate 15 tunnel to repair main drain line under the house
Excavate 15 tunnel to repair main drain line under the house
City of Austin permitPlumbing PermitActive- Record
- 2026-061474 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1809 Sylvan Dr
What work is permitted at 1809 Sylvan Dr?
Austin permits cover foundation repair with 16 exterior pilings and excavation of a tunnel to repair the main drain line under the house.
Is a new house being built at 1809 Sylvan Dr?
The permits describe repairs to an existing house, not new construction.
When were permits filed for 1809 Sylvan Dr?
The plumbing permit was filed May 26, 2026, and the building permit was filed May 28, 2026.
What is permit 2026-067384 BP for?
The City of Austin building permit, filed May 28, 2026, is for foundation repair involving 16 exterior pilings. Its status is Final.
What is permit 2026-061474 PP for?
The City of Austin plumbing permit, filed May 26, 2026, is for excavating a tunnel to repair the main drain line under the house. Its status is Active.
Also being built nearby
All of 78741- 1807 Sylvan DrAug 5, 2024Replacement of an existing water heater · 21 m away
- 1808 Sylvan DrSep 11, 2026Construct new driveway approach of 12 ft and curb & gutter of 22 ft · 48 m away
- 1806 Sylvan DrDec 2, 2024Express: bathroom/kitchen remodel fixture replacement minor mep work · 51 m away
- 1813 Parker LnJun 30, 2025House is unoccupied and the two ac & heating systems will need to be replaced. there is no duct work · 66 m away
- 1804 Sylvan DrMar 10, 2025Run conduit from building 2 to building 1 to provide electrical power & relocate existing meter at bldg1 to building 2. ref: 2023 098551 ep · 66 m away
- 1811 Parker LnNov 26, 2024New construction single family residential 2-story 3-bedroom 2.5 bath with attached 2-car garage covered front porch and habitable attic with balcony · 71 m away
- 1815 Parker LnDec 14, 2023Install power for electric car · 73 m away
- 1809 Parker LnJan 25, 2024Construct new driveway approach of 12 ft. no sidewalk inspection per plan review · 76 m away
- 1817 Parker LnMay 14, 2025Express- existing foundation repair as per scope of work attached · 87 m away
- 1717 Deerfield DrApr 30, 2026Replacement of an existing water heater swap out/ install new water heater in closet in garage · 118 m away
- 1721 Deerfield DrMar 12, 2026Emergency replacement of sewer line from house to city tap only. line is collapsed and homeowner is unable to flush their toilets. thank you · 124 m away
- 1709 Woodland AveDec 23, 202412.960kw pv roof mount solar - 32 panels 32 microinverters · 125 m away