2015 E Riverside Dr
Austin, TX 78741
2015 E Riverside Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 2015 E Riverside Dr, Austin, TX 78741 since December 19, 2023. The most recent, filed April 11, 2024, covers: “Utilize 2 access hole in concrete up to 30 feet of tunnel needed to access known leak/ break”.
Compiled from City of Austin records · updated Apr 11, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Apr 11, 2024
- since Dec 19, 2023
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsUtilize 2 access hole in concrete up to 30 feet of tunnel needed to access known leak/ break
Utilize 2 access hole in concrete up to 30 feet of tunnel needed to access known leak/ break
City of Austin permitPlumbing PermitFinal- Record
- 2024-036388 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Foundation repair - install 13 steel piers exterior break outs mudjacking
Foundation repair - install 13 steel piers exterior break outs mudjacking
City of Austin permitBuilding PermitFinal- Record
- 2023-160701 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2015 E Riverside Dr
What is being built at 2015 E Riverside Dr?
The latest filing (City of Austin permit 2024-036388 PP, April 11, 2024) covers utilize 2 access hole in concrete up to 30 feet of tunnel needed to access known leak/ break.
How many permits and filings does 2015 E Riverside Dr have?
2 filings across 2 projects, from December 19, 2023 to April 11, 2024.
What is being built near Altus Health System in Austin?
2015 E Riverside Dr is about 26 m from Altus Health System (2020 East Riverside). Its latest filing is for utilize 2 access hole in concrete up to 30 feet of tunnel needed to access known leak/ break.
Is there other construction near 2015 E Riverside Dr?
Yes. Nearby filings include 2021 E Riverside Dr (outside sewer line replacement trench approx. 115, Sep 17, 2026); 2023 E Riverside Dr (install replacement cabinet sign for riverside strip center, Jan 22, 2025); 2020 East Riverside (riverside micro hospital conversion — renovation/alteration — partial renovation of an existing facility to convert it into a specialty hospital. scope of work includes but is not limited to new finishes, interior wall partitions, site work, mechanical, plumbing, and electrical work, Mar 18, 2024).
How do I get alerts for new permits at 2015 E Riverside Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78741- 2021 E Riverside DrSep 17, 2026Outside sewer line replacement trench approx. 115 · 7 m away
- 2023 E Riverside DrJan 22, 2025Install replacement cabinet sign for riverside strip center · 9 m away
- 2020 East Riverside · Altus Health SystemMar 18, 2024Riverside micro hospital conversion — renovation/alteration — partial renovation of an existing facility to convert it into a specialty hospital. scope of work includes but is not limited to new finishes, interior wall partitions, site work, mechanical, plumbing, and electrical work · 26 m away
- 2011 Riverside DrJul 12, 2010Rivertowne mall · 100 m away
- 2120 E Riverside DrFeb 11, 2025Repairing a damaged overhead service conduit being a potential fire hazard · 113 m away
- 1505 Town Creek DrMar 19, 2024Change of use from office to restaurant interior remodel · 122 m away
- 1920 East Riverside Dr · Ss Retail Development 2013 LPJan 12, 2024Riverside & arena — renovation/alteration — major renovation of an existing starbucks. use and occupancy type to remain the same. work shall include interior partitions, interior finishes, equipment, lighting / ceiling, and furniture · 134 m away
- 1920 East Riverside Drive · Ss Retail Development 2013, LPMay 31, 2024Blvd dentistry and orthodontics — new construction — tenant finish-out · 134 m away
- 1920 E Riverside Drive · Ss Retail Development 2013 LPApr 21, 2026Wingstop (ws#0164 - relo) — renovation/alteration — tenant improvement of an existing building to support new occupancy. work includes demolition as required, construction of new interior partitions; new wall, floor, and ceiling finishes; new equipment; new lighting and electrical systems; new mech · 134 m away
- 1920 E Riverside DrNov 4, 2026Vent hood installation + adding gas equipment into the kitchen · 134 m away
- 2205 E Riverside DrMar 1, 2024Float roof overlay using single ply membrane. no structural changes · 141 m away
- 1400 Royal Crest DrMay 10, 20221400 royal crest multifamily · 145 m away