2023 E Riverside Dr
Austin, TX 78741
2023 E Riverside Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 2023 E Riverside Dr, Austin, TX 78741. The most recent, filed January 22, 2025, covers: “Install replacement cabinet sign for riverside strip center”.
Compiled from City of Austin records · updated Jan 22, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jan 22, 2025
- since Jan 22, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectInstall replacement cabinet sign for riverside strip center
Install replacement cabinet sign for riverside strip center
City of Austin permitElectrical PermitExpired- Record
- 2024-158742 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2023 E Riverside Dr
What is being built at 2023 E Riverside Dr?
The latest filing (City of Austin permit 2024-158742 EP, January 22, 2025) covers install replacement cabinet sign for riverside strip center.
How many permits and filings does 2023 E Riverside Dr have?
1 filing across 1 project, from January 22, 2025 to January 22, 2025.
What is being built near Altus Health System in Austin?
2023 E Riverside Dr is about 25 m from Altus Health System (2020 East Riverside). Its latest filing is for install replacement cabinet sign for riverside strip center.
Is there other construction near 2023 E Riverside Dr?
Yes. Nearby filings include 2021 E Riverside Dr (outside sewer line replacement trench approx. 115, Sep 17, 2026); 2015 E Riverside Dr (utilize 2 access hole in concrete up to 30 feet of tunnel needed to access known leak/ break, Apr 11, 2024); 2020 East Riverside (riverside micro hospital conversion — renovation/alteration — partial renovation of an existing facility to convert it into a specialty hospital. scope of work includes but is not limited to new finishes, interior wall partitions, site work, mechanical, plumbing, and electrical work, Mar 18, 2024).
How do I get alerts for new permits at 2023 E Riverside Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78741- 2021 E Riverside DrSep 17, 2026Outside sewer line replacement trench approx. 115 · 2 m away
- 2015 E Riverside DrApr 11, 2024Utilize 2 access hole in concrete up to 30 feet of tunnel needed to access known leak/ break · 9 m away
- 2020 East Riverside · Altus Health SystemMar 18, 2024Riverside micro hospital conversion — renovation/alteration — partial renovation of an existing facility to convert it into a specialty hospital. scope of work includes but is not limited to new finishes, interior wall partitions, site work, mechanical, plumbing, and electrical work · 25 m away
- 2011 Riverside DrJul 12, 2010Rivertowne mall · 100 m away
- 2120 E Riverside DrFeb 11, 2025Repairing a damaged overhead service conduit being a potential fire hazard · 104 m away
- 1505 Town Creek DrMar 19, 2024Change of use from office to restaurant interior remodel · 124 m away
- 2205 E Riverside DrMar 1, 2024Float roof overlay using single ply membrane. no structural changes · 133 m away
- 2220 E Riverside DrJun 30, 2026Foundation repair - install 8 steel pilings to stabilize foundation · 141 m away
- 1920 E Riverside DrNov 4, 2026Vent hood installation + adding gas equipment into the kitchen · 142 m away
- 1920 E Riverside Drive · Ss Retail Development 2013 LPApr 21, 2026Wingstop (ws#0164 - relo) — renovation/alteration — tenant improvement of an existing building to support new occupancy. work includes demolition as required, construction of new interior partitions; new wall, floor, and ceiling finishes; new equipment; new lighting and electrical systems; new mech · 142 m away
- 1920 East Riverside Dr · Ss Retail Development 2013 LPJan 12, 2024Riverside & arena — renovation/alteration — major renovation of an existing starbucks. use and occupancy type to remain the same. work shall include interior partitions, interior finishes, equipment, lighting / ceiling, and furniture · 142 m away
- 1920 East Riverside Drive · Ss Retail Development 2013, LPMay 31, 2024Blvd dentistry and orthodontics — new construction — tenant finish-out · 142 m away