2020 East Riverside
Austin, TX 78741 · Altus Health System
Specialty hospital conversion planned on East Riverside
A 9,000-square-foot renovation to convert an existing facility into a specialty hospital was registered on March 18, 2024. The TDLR filing, project TABS2024014060, describes interior, site, mechanical, plumbing, and electrical work. The applicant estimated the project cost at $3.7 million.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 18, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Mar 18, 2024
- since Mar 18, 2024
- Largest scope
- 9,000 sf
- Estimated cost
- $3.7M
- state registration
Where this project stands
CompletedRiverside Micro Hospital Conversion
9,000 sq ft · $3.7M est.
- RegisteredMar 18, 2024
- Plan review
- ConstructionApr '24 – Sep '24
- Inspected
- Closed
Ran as a 5-month build.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectPartial renovation of an existing facility to convert it into a specialty hospital. scope of work includes but is not limited to new finishes, interior wall partitions, site work, mechanical, plumbing, and electrical work. — riverside community hospital
TDLR project registrationRenovation/AlterationProject Closed9,000 sq ft$3.7M est.- Project #
- TABS2024014060
- Tenant / owner
- Riverside Micro Hospital Conversion
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2020 East Riverside
What is being built at 2020 East Riverside?
A TDLR registration describes a partial renovation of an existing facility for conversion into a specialty hospital. The filing names the project Riverside Micro Hospital Conversion.
When was the hospital conversion permitted?
The project was registered with the Texas Department of Licensing and Regulation on March 18, 2024. The registration is TABS2024014060.
How large is the Riverside hospital conversion?
The TDLR project registration lists 9,000 square feet of renovation work.
How much will the Riverside hospital project cost?
The applicant estimated the project cost at $3.7 million in the TDLR registration. This is an estimate, not a confirmed final cost.
What work is planned for the specialty hospital?
The registration describes new finishes and interior partitions, along with site, mechanical, plumbing, and electrical work.
Is a new hospital planned near H-E-B on East Riverside?
A TDLR filing describes converting an existing facility at 2020 East Riverside into a specialty hospital. H-E-B Grocery at 2508 East Riverside is listed about 246 meters away.
Also being built nearby
All of 78741- 2021 E Riverside DrSep 17, 2026Outside sewer line replacement trench approx. 115 · 25 m away
- 2023 E Riverside DrJan 22, 2025Install replacement cabinet sign for riverside strip center · 25 m away
- 2015 E Riverside DrApr 11, 2024Utilize 2 access hole in concrete up to 30 feet of tunnel needed to access known leak/ break · 26 m away
- 1505 Town Creek DrMar 19, 2024Change of use from office to restaurant interior remodel · 99 m away
- 2120 E Riverside DrFeb 11, 2025Repairing a damaged overhead service conduit being a potential fire hazard · 103 m away
- 2011 Riverside DrJul 12, 2010Rivertowne mall · 125 m away
- 2205 E Riverside DrMar 1, 2024Float roof overlay using single ply membrane. no structural changes · 137 m away
- 1920 E Riverside Drive · Ss Retail Development 2013 LPApr 21, 2026Wingstop (ws#0164 - relo) — renovation/alteration — tenant improvement of an existing building to support new occupancy. work includes demolition as required, construction of new interior partitions; new wall, floor, and ceiling finishes; new equipment; new lighting and electrical systems; new mech · 137 m away
- 1920 East Riverside Dr · Ss Retail Development 2013 LPJan 12, 2024Riverside & arena — renovation/alteration — major renovation of an existing starbucks. use and occupancy type to remain the same. work shall include interior partitions, interior finishes, equipment, lighting / ceiling, and furniture · 137 m away
- 1920 East Riverside Drive · Ss Retail Development 2013, LPMay 31, 2024Blvd dentistry and orthodontics — new construction — tenant finish-out · 137 m away
- 2220 E Riverside DrJun 30, 2026Foundation repair - install 8 steel pilings to stabilize foundation · 141 m away
- 1926 Riverside DrAug 1, 2011Pepper's bistro · 155 m away