2223 Waterloo City Ln
Austin, TX 78741
Gate work and re-roofing at Lakeshore Pearl Apartments
Permits at 2223 Waterloo City Ln cover replacement of two entry gates and a commercial re-roof at Lakeshore Pearl Apartments, rather than a new building. The gate permit, 2026-016327 BP, was filed Feb. 17, 2026, and the re-roof permit, 2025-152923 BP, was filed Dec. 30, 2025. A city site-plan case for Lakeshore Apartments Phase II was approved and released July 26, 2024.
Summarized from City of Austin records · updated Feb 17, 2026
- Projects
- 8
- 8 filings
- Latest filing
- Feb 17, 2026
- since Dec 15, 2011
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRemove and replace two gates at lakeshore pearl apartments. replace loop and sensors as needed to correct form and function of entry and egres. replace (2) gate control units with like kind and quality to meet entry egress requirements. detach and reset (1) knox box currently attached to entry gate 1 to entry gate 1 sone column. 2026 008744 da - pending
- AppliedJan 28, 2026
- IssuedFeb 17, 2026
- WorkFeb '26 – Oct '26
- Final inspectionOct 30, 2026
Passed final inspection Oct 30, 2026.
2 contacts on this project · 2 phone numbers
Permit & project history
8 projectsRemove and replace two gates at lakeshore pearl apartments. replace loop and sensors as needed to correct form and function of entry and egres. replace (2) gate control units with like kind and quality to meet entry egress requirements. detach and reset (1) knox box currently attached to entry gate 1 to entry gate 1 sone column. 2026 008744 da - pending
Remove and replace two gates at lakeshore pearl apartments. replace loop and sensors as needed to correct form and function of entry and egres. replace (2) gate control units with like kind and quality to meet entry egress requirements. detach and reset (1) knox box currently attached to entry gate 1 to entry gate 1 sone column. 2026 008744 da - pending
City of Austin permitBuilding PermitFinal- Record
- 2026-016327 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Commercial re-roof
Commercial re-roof
City of Austin permitBuilding PermitFinal- Record
- 2025-152923 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install illuminated wall sign east
Install illuminated wall sign east
City of Austin permitElectrical PermitFinal- Record
- 2024-025280 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install illuminated wall sign north
Install illuminated wall sign north
City of Austin permitElectrical PermitFinal- Record
- 2024-025287 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install illuminated wall sign
Install illuminated wall sign
City of Austin permitElectrical PermitFinal- Record
- 2024-025277 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New swimming pool
New swimming pool
City of Austin permitElectrical PermitFinal- Record
- 2021-066367 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2223 Waterloo City Ln
What is happening at 2223 Waterloo City Ln in Austin?
City permits cover replacement of two entry gates and a commercial re-roof at Lakeshore Pearl Apartments. The gate permit is 2026-016327 BP, filed Feb. 17, 2026.
Is a new apartment building being built at 2223 Waterloo City Ln?
The permits listed here are for gate replacement and re-roofing, not a new building. A Lakeshore Apartments Phase II site-plan case was approved and released on July 26, 2024.
When was the gate replacement permit filed at Lakeshore Pearl Apartments?
Permit 2026-016327 BP was filed Feb. 17, 2026. It covers replacing two gates and gate-control units.
When was the roof permit filed at 2223 Waterloo City Ln?
The commercial re-roof permit, 2025-152923 BP, was filed Dec. 30, 2025.
What is happening near Oracle Wf Av Wall in Austin?
At 2223 Waterloo City Ln, about 245 meters from Oracle Wf Av Wall, city permits cover gate replacement and commercial re-roof work at Lakeshore Pearl Apartments.
Was Lakeshore Apartments Phase II approved?
The City of Austin site-plan case for Lakeshore Apartments Phase II was approved and released on July 26, 2024.
Also being built nearby
All of 78741- 1201 Lady Bird LnSep 20, 2013Lakeshore apartments- lot 10 · 110 m away
- 1307-1/2 Tinnin Ford RdMar 2, 2007Chelsea on the lake (telecommunication tower) · 178 m away
- 2201 South Lakeshore BlvdSep 17, 2013Lakeshore phase 1 · 177 m away
- 2225 Elmont DrMay 7, 2016Lot 18 lakeshore · 178 m away
- 1301 Tinnin Ford RdApr 24, 2016Lakeshore lots 2-4 · 182 m away
- 1401 Tinnin Ford RdApr 28, 2025Install permanent overhead 200amp service for existing parking lot lights and existing gate at 2223 waterloo city lane · 188 m away
- 1201 Tinnin Ford RdJun 14, 2024Tinnin ford road demolition · 199 m away
- 2215 Town Lake CirJul 22, 2025***timed virtual inspection: 12/22/2025 @ 10 am*** replacement of complete existing central heat and air system with or without duct work · 212 m away
- 2101 Elmont DrJul 22, 2025Replacement of complete existing central heat and air system with or without duct work · 216 m away
- 1318 Tinnin Ford RdJul 12, 2024Install evse · 221 m away
- 2300 Oracle Way · Oracle America INCAug 12, 20267 day - interior alteration of approximately 3823 sq ft of existing office space - ova · 245 m away
- 1305 Town Creek DrApr 12, 2024New photovoltaic roof mounted system - 4.860 kw dc/3.800 kw ac & new franklin battery · 266 m away