Yard sewer line replacement permitted at 2408 Ventura Dr
A yard sewer line replacement was permitted at 2408 Ventura Dr in Austin. The City of Austin issued plumbing permit 2026-135020 PP on October 19, 2026.
Summarized from City of Austin records · updated Oct 19, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 19, 2026
- since Oct 19, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayReplace yard sewer line
- AppliedOct 14, 2026
- IssuedOct 19, 2026
- WorkOct '26 – Apr '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace yard sewer line
Replace yard sewer line
City of Austin permitPlumbing PermitActive- Record
- 2026-135020 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2408 Ventura Dr
What is happening at 2408 Ventura Dr?
A City of Austin plumbing permit indicates that the yard sewer line is being replaced. The permit was issued October 19, 2026.
Is a new building being built at 2408 Ventura Dr?
The available permit is for replacing a yard sewer line, not for building a new structure.
What is permit 2026-135020 PP for?
City of Austin permit 2026-135020 PP is for replacing the yard sewer line at 2408 Ventura Dr. It is listed as an active plumbing permit.
When was the sewer line work at 2408 Ventura Dr permitted?
The City of Austin permit was filed on October 19, 2026.
Is a business opening at 2408 Ventura Dr?
The available record describes sewer line replacement work and does not identify a business opening.
Also being built nearby
All of 78741- 2402 Ventura DrJan 22, 2026Tunnel under foundation to repipe cast iron for 2 full bathrooms kitchen and washer. three access holes will be made one on the right side of the home outside the second will be made in the the back behind the master bathroom and the third will be made in the front total length of tunnel will be 75 feet · 66 m away
- 3405 Santa Monica DrAug 4, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 81 m away
- 3401 Santa Monica DrAug 11, 2025Replacement of an existing water heater installing like/like g water heater · 114 m away
- 2306 Ventura DrSep 16, 2026Replace the compromised kitchen drain laundry drain and associated building drain through an approximately 35-foot tunnel beneath the foundation. the tunnel will extend from the existing cleanout on the left side of the home toward the kitchen and laundry area ending at the washing machine drain connection. existing cast iron piping and branch drain lines will be removed and replaced with new schedule 40 pvc drainage piping · 137 m away
- 3314 Burleson RdMar 2, 2007Heights assembly of god parking addition · 148 m away
- 3402 Laguna DrAug 13, 2024Replacement of complete existing central heat and air system with or without duct work · 155 m away
- 3401 Laguna DrMar 23, 2024New 200 amp service. including through the roof riser austin energy meter base and 200 amp disconnect · 156 m away
- 3303 Santa Monica DrMar 24, 2025Tunnel under foundation approximately 40ft total to replumb/re-route drain system up to exterior cleanout · 161 m away
- 3400 Laguna DrNov 14, 2024Branch damaged existing service service has to be rebuild · 173 m away
- 3401 Burleson RdAug 14, 2026New 1-story 3 bedroom 2 bathroom manufactured home · 181 m away
- 2300 Mission Hill DrSep 19, 2024Repaired broken washing machine drain line under slab via tunnel on unit b · 182 m away
- 3503 Santa Fe DrJul 11, 2024Emergency - damaged electrical service from fallen tree branch repair riser and 1-point rack to restore lost power. 200a overhead · 187 m away