2500 Ware Rd
Austin, TX 78741
2500 Ware Rd: 1 project on record
City of Austin lists 1 filing across 1 project at 2500 Ware Rd, Austin, TX 78741. The most recent, filed March 28, 2025, covers: “Express: replace 3 windows like for like”.
Compiled from City of Austin records · updated Mar 28, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Mar 28, 2025
- since Mar 28, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectExpress: replace 3 windows like for like
Express: replace 3 windows like for like
City of Austin permitBuilding PermitFinal- Record
- 2025-031687 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2500 Ware Rd
What is being built at 2500 Ware Rd?
The latest filing (City of Austin permit 2025-031687 BP, March 28, 2025) covers express: replace 3 windows like for like.
How many permits and filings does 2500 Ware Rd have?
1 filing across 1 project, from March 28, 2025 to March 28, 2025.
Is there other construction near 2500 Ware Rd?
Yes. Nearby filings include 2505 Ware Rd (tunnel under foundation to repipe drain lines for bathroom that includes shower tub lavatory and toilet drain. reroute washer drain line through car port the front and repipe kitchen drain line to the main sewer line. total length of tunneling is approximately 30 feet. sewer line will also be replaced from the home to the city tap connection total length of the sewer line is 30 feet, Apr 28, 2025); 2506 Ware Rd (interior remodel, Apr 3, 2025); 2503 Ware Rd (tunnel under slab foundation and replace 20 linear feet of broken cast iron with new schedule 40 pvc and also replacing 30 feet of sewer yard line with new shedule 40 pvc, Jan 30, 2026).
How do I get alerts for new permits at 2500 Ware Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78741- 2505 Ware RdApr 28, 2025Tunnel under foundation to repipe drain lines for bathroom that includes shower tub lavatory and toilet drain. reroute washer drain line through car port the front and repipe kitchen drain line to the main sewer line. total length of tunneling is approximately 30 feet. sewer line will also be replaced from the home to the city tap connection total length of the sewer line is 30 feet · 67 m away
- 2506 Ware RdApr 3, 2025Interior remodel · 70 m away
- 2503 Ware RdJan 30, 2026Tunnel under slab foundation and replace 20 linear feet of broken cast iron with new schedule 40 pvc and also replacing 30 feet of sewer yard line with new shedule 40 pvc · 72 m away
- 2507 Princeton DrAug 7, 2024Replacement of complete existing central heat and air system with or without duct work · 97 m away
- 2405 Ware RdApr 7, 2026Express: replace 2 damaged bathroom windows · 138 m away
- 2603 Ware RdFeb 23, 2024Replacement of lonestar upflow natural gas 3.5 ton 15.20 seer condensor and 2 flex duct outlets · 147 m away
- 2600 Princeton DrMar 2, 2026Replacement of complete existing central heat and air system with or without duct work · 162 m away
- 2702 Collins Creek DrJan 8, 2024Express foundation repair - 18 exterior pilings on both unit a & b · 172 m away
- 2501 Douglas StSep 23, 2026Replace main sewer line from the home to the city tap connection total length of sewer line is approximately 53 feet long · 176 m away
- 2401 Ware RdSep 1, 2026Replacement of complete existing central heat and air system with or without duct work jessica ledbetter: replace 3.5-ton like-for-like system · 180 m away
- 2606 Ware RdJul 28, 2024Garage conversion (not adding square feet or changing layout) · 181 m away
- 2701 Ware RdMay 14, 2026Replacing existing electrical panel and a meter · 212 m away