2503 Ware Rd
Austin, TX 78741
2503 Ware Rd: 1 project on record
City of Austin lists 1 filing across 1 project at 2503 Ware Rd, Austin, TX 78741. The most recent, filed January 30, 2026, covers: “Tunnel under slab foundation and replace 20 linear feet of broken cast iron with new schedule 40 pvc and also replacing 30 feet of sewer yard line with new shedule 40 pvc”.
Compiled from City of Austin records · updated Jan 30, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jan 30, 2026
- since Jan 30, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectTunnel under slab foundation and replace 20 linear feet of broken cast iron with new schedule 40 pvc and also replacing 30 feet of sewer yard line with new shedule 40 pvc
Tunnel under slab foundation and replace 20 linear feet of broken cast iron with new schedule 40 pvc and also replacing 30 feet of sewer yard line with new shedule 40 pvc
City of Austin permitPlumbing PermitFinal- Record
- 2026-007454 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2503 Ware Rd
What is being built at 2503 Ware Rd?
The latest filing (City of Austin permit 2026-007454 PP, January 30, 2026) covers tunnel under slab foundation and replace 20 linear feet of broken cast iron with new schedule 40 pvc and also replacing 30 feet of sewer yard line with new shedule 40 pvc.
How many permits and filings does 2503 Ware Rd have?
1 filing across 1 project, from January 30, 2026 to January 30, 2026.
Is there other construction near 2503 Ware Rd?
Yes. Nearby filings include 2505 Ware Rd (tunnel under foundation to repipe drain lines for bathroom that includes shower tub lavatory and toilet drain. reroute washer drain line through car port the front and repipe kitchen drain line to the main sewer line. total length of tunneling is approximately 30 feet. sewer line will also be replaced from the home to the city tap connection total length of the sewer line is 30 feet, Apr 28, 2025); 2500 Ware Rd (express: replace 3 windows like for like, Mar 28, 2025); 2506 Ware Rd (interior remodel, Apr 3, 2025).
How do I get alerts for new permits at 2503 Ware Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78741- 2505 Ware RdApr 28, 2025Tunnel under foundation to repipe drain lines for bathroom that includes shower tub lavatory and toilet drain. reroute washer drain line through car port the front and repipe kitchen drain line to the main sewer line. total length of tunneling is approximately 30 feet. sewer line will also be replaced from the home to the city tap connection total length of the sewer line is 30 feet · 31 m away
- 2500 Ware RdMar 28, 2025Express: replace 3 windows like for like · 72 m away
- 2506 Ware RdApr 3, 2025Interior remodel · 88 m away
- 2603 Ware RdFeb 23, 2024Replacement of lonestar upflow natural gas 3.5 ton 15.20 seer condensor and 2 flex duct outlets · 117 m away
- 2507 Princeton DrAug 7, 2024Replacement of complete existing central heat and air system with or without duct work · 143 m away
- 2405 Ware RdApr 7, 2026Express: replace 2 damaged bathroom windows · 151 m away
- 2702 Collins Creek DrJan 8, 2024Express foundation repair - 18 exterior pilings on both unit a & b · 157 m away
- 2606 Ware RdJul 28, 2024Garage conversion (not adding square feet or changing layout) · 172 m away
- 2701 Ware RdMay 14, 2026Replacing existing electrical panel and a meter · 183 m away
- 2401 Ware RdSep 1, 2026Replacement of complete existing central heat and air system with or without duct work jessica ledbetter: replace 3.5-ton like-for-like system · 197 m away
- 2600 Princeton DrMar 2, 2026Replacement of complete existing central heat and air system with or without duct work · 205 m away
- 2601 Pleasant Valley RdMar 2, 2007Pleasant valley villas (smart housing) · 220 m away