2405 Ware Rd
Austin, TX 78741
2405 Ware Rd: 1 project on record
City of Austin lists 1 filing across 1 project at 2405 Ware Rd, Austin, TX 78741. The most recent, filed April 7, 2026, covers: “Express: replace 2 damaged bathroom windows”.
Compiled from City of Austin records · updated Apr 7, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 7, 2026
- since Apr 7, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectExpress: replace 2 damaged bathroom windows
Express: replace 2 damaged bathroom windows
City of Austin permitBuilding PermitActive- Record
- 2026-042177 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2405 Ware Rd
What is being built at 2405 Ware Rd?
The latest filing (City of Austin permit 2026-042177 BP, April 7, 2026) covers express: replace 2 damaged bathroom windows.
How many permits and filings does 2405 Ware Rd have?
1 filing across 1 project, from April 7, 2026 to April 7, 2026.
Is there other construction near 2405 Ware Rd?
Yes. Nearby filings include 2401 Ware Rd (replacement of complete existing central heat and air system with or without duct work jessica ledbetter: replace 3.5-ton like-for-like system, Sep 1, 2026); 2702 Collins Creek Dr (express foundation repair - 18 exterior pilings on both unit a & b, Jan 8, 2024); 2500 Ware Rd (express: replace 3 windows like for like, Mar 28, 2025).
How do I get alerts for new permits at 2405 Ware Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78741- 2401 Ware RdSep 1, 2026Replacement of complete existing central heat and air system with or without duct work jessica ledbetter: replace 3.5-ton like-for-like system · 46 m away
- 2702 Collins Creek DrJan 8, 2024Express foundation repair - 18 exterior pilings on both unit a & b · 66 m away
- 2500 Ware RdMar 28, 2025Express: replace 3 windows like for like · 138 m away
- 2503 Ware RdJan 30, 2026Tunnel under slab foundation and replace 20 linear feet of broken cast iron with new schedule 40 pvc and also replacing 30 feet of sewer yard line with new shedule 40 pvc · 151 m away
- 2602 Collins Creek DrJan 8, 2024Express - foundation repair - 23 exterior & 22 interior pilings · 164 m away
- 2505 Ware RdApr 28, 2025Tunnel under foundation to repipe drain lines for bathroom that includes shower tub lavatory and toilet drain. reroute washer drain line through car port the front and repipe kitchen drain line to the main sewer line. total length of tunneling is approximately 30 feet. sewer line will also be replaced from the home to the city tap connection total length of the sewer line is 30 feet · 174 m away
- 2347 Douglas StSep 5, 2025Replacement of furnace only replacement of a 3 ton airhandler with a new 3 ton airhandler in unit 7107 · 196 m away
- 2506 Ware RdApr 3, 2025Interior remodel · 206 m away
- 2507 Princeton DrAug 7, 2024Replacement of complete existing central heat and air system with or without duct work · 231 m away
- 2501 Douglas StSep 23, 2026Replace main sewer line from the home to the city tap connection total length of sewer line is approximately 53 feet long · 261 m away
- 2603 Ware RdFeb 23, 2024Replacement of lonestar upflow natural gas 3.5 ton 15.20 seer condensor and 2 flex duct outlets · 266 m away
- 2336 Douglas StOct 7, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system without duct work for unit 406 · 284 m away