2602 Collins Creek Dr
Austin, TX 78741
2602 Collins Creek Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 2602 Collins Creek Dr, Austin, TX 78741. The most recent, filed January 8, 2024, covers: “Express - foundation repair - 23 exterior & 22 interior pilings”.
Compiled from City of Austin records · updated Jan 8, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jan 8, 2024
- since Jan 8, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredExpress - foundation repair - 23 exterior & 22 interior pilings
- AppliedJan 8, 2024
- IssuedJan 8, 2024
- !WorkJan '24 – Jul '24
- Final inspection
Marked expired Jul 24, 2024.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectExpress - foundation repair - 23 exterior & 22 interior pilings
Express - foundation repair - 23 exterior & 22 interior pilings
City of Austin permitBuilding PermitExpired- Record
- 2024-002157 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2602 Collins Creek Dr
What is being built at 2602 Collins Creek Dr?
The latest filing (City of Austin permit 2024-002157 BP, January 8, 2024) covers express - foundation repair - 23 exterior & 22 interior pilings.
How many permits and filings does 2602 Collins Creek Dr have?
1 filing across 1 project, from January 8, 2024 to January 8, 2024.
Is there other construction near 2602 Collins Creek Dr?
Yes. Nearby filings include 2702 Collins Creek Dr (express foundation repair - 18 exterior pilings on both unit a & b, Jan 8, 2024); 2405 Ware Rd (express: replace 2 damaged bathroom windows, Apr 7, 2026); 2401 Ware Rd (replacement of complete existing central heat and air system with or without duct work jessica ledbetter: replace 3.5-ton like-for-like system, Sep 1, 2026).
How do I get alerts for new permits at 2602 Collins Creek Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78741- 2702 Collins Creek DrJan 8, 2024Express foundation repair - 18 exterior pilings on both unit a & b · 101 m away
- 2405 Ware RdApr 7, 2026Express: replace 2 damaged bathroom windows · 164 m away
- 2401 Ware RdSep 1, 2026Replacement of complete existing central heat and air system with or without duct work jessica ledbetter: replace 3.5-ton like-for-like system · 167 m away
- 2504 Huntwick DrAug 1, 2025Removal of existing time clock (mechanical or digital) installation of new lighting for time clock (standard digital or mechanical model) connection to existing load wiring setup and programming of lighting schedule per managers request testing and verification of proper function safe work practices and cleanup will also need to replace the subpanel on the load side of the meter and the ac disconnect* *[building 14 per ec. replacement of house panel only per ec] · 180 m away
- 2413 Ware RdApr 14, 2026Express: repair and replace rotted and damaged roof and decking revision-replacing rotten wood siding with cement fiberboard siding and replacing front exterior single pane windows with double pane like for like · 180 m away
- 2601 Pleasant Valley RdMar 2, 2007Pleasant valley villas (smart housing) · 213 m away
- 2511-1/2 Oltorf StNov 3, 2026Country club creek trail- elmont dr. to e. oltorf st · 216 m away
- 2503 Ware RdJan 30, 2026Tunnel under slab foundation and replace 20 linear feet of broken cast iron with new schedule 40 pvc and also replacing 30 feet of sewer yard line with new shedule 40 pvc · 230 m away
- 2503 E Oltorf StSep 17, 2026Replacement of complete existing central heat and air system with or without duct work · 237 m away
- 2504 E Oltorf StDec 27, 2023Replace pool deck - like for like · 248 m away
- 2505 Ware RdApr 28, 2025Tunnel under foundation to repipe drain lines for bathroom that includes shower tub lavatory and toilet drain. reroute washer drain line through car port the front and repipe kitchen drain line to the main sewer line. total length of tunneling is approximately 30 feet. sewer line will also be replaced from the home to the city tap connection total length of the sewer line is 30 feet · 262 m away
- 2500 Ware RdMar 28, 2025Express: replace 3 windows like for like · 265 m away