2601 Pleasant Valley Rd
Austin, TX 78741
2601 Pleasant Valley Rd: 1 project on record
City of Austin lists 1 filing across 1 project at 2601 Pleasant Valley Rd, Austin, TX 78741. The most recent, filed March 2, 2007, covers: “Pleasant valley villas (smart housing)”.
Compiled from City of Austin records · updated Mar 2, 2007
- Projects
- 1
- 1 filings
- Latest filing
- Mar 2, 2007
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 2601 Pleasant Valley Rd
What is being built at 2601 Pleasant Valley Rd?
The latest filing (City of Austin case 221835, March 2, 2007) covers pleasant valley villas (smart housing).
How many permits and filings does 2601 Pleasant Valley Rd have?
1 filing across 1 project, from March 2, 2007 to March 2, 2007.
Is there other construction near 2601 Pleasant Valley Rd?
Yes. Nearby filings include 2602 Collins Creek Dr (express - foundation repair - 23 exterior & 22 interior pilings, Jan 8, 2024); 2503 Ware Rd (tunnel under slab foundation and replace 20 linear feet of broken cast iron with new schedule 40 pvc and also replacing 30 feet of sewer yard line with new shedule 40 pvc, Jan 30, 2026); 4507 Elana Ct (new prefabricated pool (140 sq ft) over concrete slab (286 sq ft). demolish existing wood deck, Sep 16, 2026).
How do I get alerts for new permits at 2601 Pleasant Valley Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78741- 2602 Collins Creek DrJan 8, 2024Express - foundation repair - 23 exterior & 22 interior pilings · 213 m away
- 2503 Ware RdJan 30, 2026Tunnel under slab foundation and replace 20 linear feet of broken cast iron with new schedule 40 pvc and also replacing 30 feet of sewer yard line with new shedule 40 pvc · 220 m away
- 4507 Elana CtSep 16, 2026New prefabricated pool (140 sq ft) over concrete slab (286 sq ft). demolish existing wood deck · 223 m away
- 2505 Ware RdApr 28, 2025Tunnel under foundation to repipe drain lines for bathroom that includes shower tub lavatory and toilet drain. reroute washer drain line through car port the front and repipe kitchen drain line to the main sewer line. total length of tunneling is approximately 30 feet. sewer line will also be replaced from the home to the city tap connection total length of the sewer line is 30 feet · 240 m away
- 2702 Collins Creek DrJan 8, 2024Express foundation repair - 18 exterior pilings on both unit a & b · 240 m away
- 4506 Elana CtSep 30, 2026Whole home water repipe. new main water service from city meter to home. removing all old water lines in home and repiping with pex water pipe. installing new water heater · 242 m away
- 2504 Huntwick DrAug 1, 2025Removal of existing time clock (mechanical or digital) installation of new lighting for time clock (standard digital or mechanical model) connection to existing load wiring setup and programming of lighting schedule per managers request testing and verification of proper function safe work practices and cleanup will also need to replace the subpanel on the load side of the meter and the ac disconnect* *[building 14 per ec. replacement of house panel only per ec] · 243 m away
- 2603 Ware RdFeb 23, 2024Replacement of lonestar upflow natural gas 3.5 ton 15.20 seer condensor and 2 flex duct outlets · 256 m away
- 4511 Elana CtDec 27, 2024Excavate a 70 tunnel and replace mainline until break at 45. replace entire branch main. replace kitchen line and laundry line · 266 m away
- 2450 Wickersham LnJul 10, 2026Replacement of complete existing central heat and air system with or without duct work replace a 2 ton electric unit · 278 m away
- 2701 Ware RdMay 14, 2026Replacing existing electrical panel and a meter · 285 m away
- 2500 Ware RdMar 28, 2025Express: replace 3 windows like for like · 291 m away