2509 Glen Springs Way
Austin, TX 78741
Drain system replacement permitted at 2509 Glen Springs Way
A plumbing permit indicates work to replace the entire drain system at 2509 Glen Springs Way, including a 60-foot tunnel beneath the foundation and three access holes. The City of Austin issued the permit on December 10, 2025.
Summarized from City of Austin records · updated Dec 10, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 10, 2025
- since Dec 10, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled60 tunnel below the foundation to replace entire drain system. 3 access holes - front back and left
- AppliedNov 14, 2025
- IssuedDec 10, 2025
- WorkDec '25 – Jan '26
- Final inspectionJan 23, 2026
Passed final inspection Jan 23, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 project60 tunnel below the foundation to replace entire drain system. 3 access holes - front back and left
60 tunnel below the foundation to replace entire drain system. 3 access holes - front back and left
City of Austin permitPlumbing PermitFinal- Record
- 2025-146947 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2509 Glen Springs Way
What is being built at 2509 Glen Springs Way?
The permit describes drain-system replacement work at the residence, not a new building. It calls for a 60-foot tunnel beneath the foundation and three access holes.
What work was permitted at 2509 Glen Springs Way in Austin?
The City of Austin issued plumbing permit 2025-146947 PP on December 10, 2025, for replacement of the entire drain system.
When was the drain replacement permit issued at 2509 Glen Springs Way?
The permit was issued on December 10, 2025. Its status is listed as Final.
Does the permit at 2509 Glen Springs Way indicate new construction?
No. The permit describes plumbing work to replace an existing drain system beneath the foundation.
How long is the tunnel planned at 2509 Glen Springs Way?
The permit description specifies a 60-foot tunnel below the foundation, with three access holes.
Also being built nearby
All of 78741- 2507 Glen Springs WayJan 23, 2026Replacement of an existing water heater remove and replace water heater - 50 gal gas · 22 m away
- 2511 Glen Springs WayDec 30, 2024Install level 2 ev charger · 24 m away
- 2408 Braxton CvMay 13, 2024Domestic water line replacement from meter to home · 46 m away
- 2510 Glen Springs WayNov 20, 2023Install level 2 ev charger per austin energys plug-in rebate guidelines · 47 m away
- 2500 Parker LnMay 29, 2025Amnesty co for two story single-family residence circa 1966 · 58 m away
- 2501 Candlewood CtOct 16, 2026Expose and repair waste pvc piping below the slab with an 22 tunnel from outside of foundation · 58 m away
- 2501 Glen Springs WayAug 8, 2024*emergency permit ~ abc outage* repairing and replacing the meter & weatherhead · 78 m away
- 2601 Parker LnApr 2, 2026Express- foundation repair on a slab foundation. install 44 total press piling piers including 19 perimeter and 25 interior locations. 25 breakthrough and patched location. we will improve level to the extent · 90 m away
- 2411 Glen Springs WayDec 10, 202515ft tunnel sewer line repair underneath the foundation of the home · 92 m away
- 2502 Candlewood CtAug 28, 2024Replace all cast iron under house · 102 m away
- 2502 Glen Springs WayFeb 9, 2024Replacement of an existing water heater · 107 m away
- 2504 Candlewood CtApr 4, 2025Upgrade of service · 113 m away