Linder Elementary School replacement planned in Austin
A 102,000-square-foot replacement for Linder Elementary School is registered as new construction at 2818 Metcalfe Road. The Texas Department of Licensing and Regulation record was filed July 15, 2024, and lists an estimated project cost of $58 million.
Summarized from Texas Department of Licensing and Regulation records · updated Jul 15, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jul 15, 2024
- since Jul 15, 2024
- Largest scope
- 102,000 sf
- Estimated cost
- $58M
- state registration
Where this project stands
Finishing up · inspection nextLinder Elementary School Replacement
102,000 sq ft · $58M est.
- RegisteredJul 15, 2024
- Plan review
- ConstructionSep '24 – May '26
- Inspectednow
- Closed
Scheduled to finish May 1, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectComprehensive replacement of existing elementary school — linder elementary school
TDLR project registrationNew ConstructionReview Complete102,000 sq ft$58M est.- Project #
- TABS2024023062
- Tenant / owner
- Linder Elementary School Replacement
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2818 Metcalfe Road
What is being built at 2818 Metcalfe Road in Austin?
The project is a comprehensive replacement of the existing Linder Elementary School. The TDLR registration describes it as new construction.
Is Linder Elementary School being replaced?
Yes. A TDLR project registration describes a comprehensive replacement of the existing elementary school at 2818 Metcalfe Road.
When was the Linder Elementary School replacement filed?
The TDLR registration was filed July 15, 2024. Its project number is TABS2024023062.
How large is the Linder Elementary School replacement?
The project registration lists 102,000 square feet.
How much is the Linder Elementary School project estimated to cost?
The applicant's TDLR registration estimates the project cost at $58 million.
What is the status of the Linder Elementary School project?
The TDLR record lists the status as Review Complete. That is the status shown in the registration, not confirmation that construction is complete.
Also being built nearby
All of 78741- 2605 Reeves CirJul 2, 2025Replacement of complete existing central heat and air system with or without duct work · 40 m away
- 2807-1/2 Metcalfe RdAug 20, 2026Metcalfe wastewater extension · 55 m away
- 2810 Metcalfe RdJan 13, 2025Shapiro glantz heights · 65 m away
- 2609 Metcalfe RdAug 8, 2025Replacement of complete existing central heat and air system with or without duct work · 120 m away
- 2818 Metcalfe RdSep 14, 2026Construct new driveway approach of 21 ft and sidewalk of 20 lf and curb & gutter of 42 ft. phase 2 sp-2024-0107cx 2025 017372 000 00 ssi · 129 m away
- 2007 Iroquois LnJul 3, 2024Upgrading panel and meter can and riser to code. adding surge protection and grounding · 163 m away
- 2009 Iroquois LnJul 12, 2024Construct new driveway approach of 22.33 ft. no sidewalk inspection per plan review · 165 m away
- 2003 Iroquois LnSep 5, 2025Dig two access hole to pipe burst 3/4-1 water line up to 50.includes- trenchless also replace existing water heater with new one · 172 m away
- 2008 Tripshaw LnJun 3, 2026(paterson robert) - installation of circuit for elec. vehicle charging station - esip · 173 m away
- 2624 Metcalfe RdJan 21, 2022Metcalfe townhomes · 173 m away
- 2700 Burleson RdNov 16, 20262700 burleson site plan · 189 m away
- 2602 Douglas StApr 11, 2024New two story res with basement garage 4/9/24 inspector to conduct a life safety inspection to final permit · 191 m away