3014 Sunridge Dr
Austin, TX 78741
3014 Sunridge Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 3014 Sunridge Dr, Austin, TX 78741. The most recent, filed August 29, 2016, covers: “Sunridge park section one lot 1 block e; resubdivision”.
Compiled from City of Austin records · updated Aug 29, 2016
- Projects
- 1
- 1 filings
- Latest filing
- Aug 29, 2016
- since Aug 29, 2016
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 3014 Sunridge Dr
What is being built at 3014 Sunridge Dr?
The latest filing (City of Austin case 11315447, August 29, 2016) covers sunridge park section one lot 1 block e; resubdivision.
How many permits and filings does 3014 Sunridge Dr have?
1 filing across 1 project, from August 29, 2016 to August 29, 2016.
Is there other construction near 3014 Sunridge Dr?
Yes. Nearby filings include 3018 Sunridge Dr (we will have three access holes and excavate 85 of tunnel with repairs/replacement of pipe and fittings to 5 fixtures in the home, Oct 15, 2026); 3012 Sunridge Dr (replacement of complete existing central heat and air system with or without duct work, Apr 4, 2024); 3010 Sunridge Dr (express: foundation repair (install 13 pilings), Nov 16, 2026).
How do I get alerts for new permits at 3014 Sunridge Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78741- 3018 Sunridge DrOct 15, 2026We will have three access holes and excavate 85 of tunnel with repairs/replacement of pipe and fittings to 5 fixtures in the home · 35 m away
- 3012 Sunridge DrApr 4, 2024Replacement of complete existing central heat and air system with or without duct work · 35 m away
- 3010 Sunridge DrNov 16, 2026Express: foundation repair (install 13 pilings) · 62 m away
- 3015 Sunridge DrMar 27, 2026Express - foundation repair on a slab foundation. intend to install 30 total press pilings including 19 perimeter and 11 interior locations. there will be 19 breakthroughs and patched locations. will improve level to the extent. revision 1: add plumbing permit · 67 m away
- 2921 Allison DrJul 2, 20249 zone residential irrigation · 96 m away
- 3009 Sunridge DrSep 22, 2026Perform an under-slab sanitary sewer repair using the tunneling method to access and repair a break serving one bathroom group. the initial repair is anticipated to involve approximately 25 feet of horizontal sanitary sewer piping · 104 m away
- 3025 Sunridge DrMay 5, 2026Service upgrade · 120 m away
- 3007 Sunridge DrJul 22, 2026Replacement of complete existing central heat and air system with or without duct work · 124 m away
- 3027 Sunridge DrNov 13, 2025Upgrade panel 100 to 200 amp · 139 m away
- 3002 Sunridge DrSep 19, 2025Repair broken water line in foundation · 168 m away
- 2909 Allison DrApr 17, 2024Replacement of complete existing central heat and air system with or without duct work · 173 m away
- 4702 Sunridge CtJul 15, 2026Replacement of complete existing central heat and air system with or without duct work hvac change out · 173 m away