4544 Oltorf St
Austin, TX 78741
Apartment site plan approved at 4544 Oltorf St
City of Austin records indicate an apartment project at 4544 Oltorf St, with an Oltorf Site Plan approved and released on June 11, 2024. The records do not specify the project’s size, unit count, or cost.
Summarized from City of Austin records · updated Jun 11, 2024
- Projects
- 9
- 9 filings
- Latest filing
- Jun 11, 2024
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
9 projectsSources: City of Austin
Questions about 4544 Oltorf St
What is being built at 4544 Oltorf St?
City of Austin records categorize the site as an apartment project. An Oltorf Site Plan was approved and released on June 11, 2024.
Was the site plan for 4544 Oltorf St approved?
Yes. City case 12663293, named Oltorf Site Plan, has a status of Approved and Released, dated June 11, 2024.
When was the apartment project at 4544 Oltorf St permitted?
The latest filing is the Oltorf Site Plan, dated June 11, 2024. The case status is Approved and Released.
How many apartments are planned at 4544 Oltorf St?
The available City of Austin records do not state a unit count.
How much will the project at 4544 Oltorf St cost?
The available records do not provide a project cost estimate.
Are the older Wickersham multifamily plans still active?
The Wickersham Multifamily case filed in 2016 was withdrawn, and its 2016 resubmittal case expired. The more recent Oltorf Site Plan was approved and released in June 2024.
Also being built nearby
All of 78741- 4500 Oltorf StMar 2, 2007Monaco condominiums · 102 m away
- 4500 E Oltorf StNov 3, 2026Replacement of complete existing central heat and air system with or without duct work allen stephens 4500 e oltorf street unit 420 austin tx 78741 · 140 m away
- 4404 Oltorf StOct 13, 2016Oltorf multi-family site & 4501 sheringham drive · 202 m away
- 2400 Wickersham LnJun 13, 2025Connect cellular controllers to existing domestic water heaters for austin energy to allow the utility to turn off appliances during peak demand on the power grid. demand response (dm) pilot funded by department of energy. building 17 units 177-180 277-280 · 212 m away
- 4404 E Oltorf StMar 28, 2024Building 6. install clean out and repipe main under building · 251 m away
- 4801 E Oltorf StOct 3, 2024Tunnel 15 under slab to repair separated sewer line under home. ***the tunnel access will be located on the left side of the home near the window. we will be tunneling approximately 15 ft under home to locate the separation of the sewer line in order to make repairs · 262 m away
- 4805 E Oltorf StJul 15, 2025Replacement of complete existing central heat and air system with or without duct work · 267 m away
- 4807 E Oltorf StMay 2, 2025Replacement of complete existing central heat and air system with or without duct work replacement of complete central heat and air system - same size unit for unit - no ducting · 270 m away
- 4809 E Oltorf StMar 6, 2026Replacement of complete existing central heat and air system with or without duct work · 272 m away
- 2501 Wickersham LnJun 30, 2025Replacement of complete existing central heat and air system with or without duct work replacing 1.5 ton ac and air handler with new 1.5 ton ac and air handler apt 2323 · 293 m away
- 2450 Wickersham LnJul 10, 2026Replacement of complete existing central heat and air system with or without duct work replace a 2 ton electric unit · 299 m away
- 2504 Huntwick DrAug 1, 2025Removal of existing time clock (mechanical or digital) installation of new lighting for time clock (standard digital or mechanical model) connection to existing load wiring setup and programming of lighting schedule per managers request testing and verification of proper function safe work practices and cleanup will also need to replace the subpanel on the load side of the meter and the ac disconnect* *[building 14 per ec. replacement of house panel only per ec] · 308 m away