groundranger
Historic · latest filing Jul 2024Residential

6021 Bluebell Cir

Austin, TX 78741

6021 Bluebell Cir: 1 project on record

City of Austin lists 1 filing across 1 project at 6021 Bluebell Cir, Austin, TX 78741. The most recent, filed July 1, 2024, covers: “Emergency permit to reattach main panel & meter enclosure separated from structure. **screws were not properly fastened to the studs causing them to fall”.

Compiled from City of Austin records · updated Jul 1, 2024

Projects
1
1 filings
Latest filing
Jul 1, 2024
since Jul 1, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Emergency permit to reattach main panel & meter enclosure separated from structure. **screws were not properly fastened to the studs causing them to fall

  1. AppliedJun 27, 2024
  2. IssuedJul 1, 2024
  3. WorkJul '24 – Jul '24
  4. Final inspectionJul 3, 2024

Passed final inspection Jul 3, 2024.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Emergency permit to reattach main panel & meter enclosure separated from structure. **screws were not properly fastened to the studs causing them to fall

    Emergency permit to reattach main panel & meter enclosure separated from structure. **screws were not properly fastened to the studs causing them to fall

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 6021 Bluebell Cir

What is being built at 6021 Bluebell Cir?

The latest filing (City of Austin permit 2024-080551 EP, July 1, 2024) covers emergency permit to reattach main panel & meter enclosure separated from structure. **screws were not properly fastened to the studs causing them to fall.

How many permits and filings does 6021 Bluebell Cir have?

1 filing across 1 project, from July 1, 2024 to July 1, 2024.

Is there other construction near 6021 Bluebell Cir?

Yes. Nearby filings include 6104 Fairway St (upgrade full service loop including meter riser & panel to 200 amps, Jan 20, 2025); 6118 Fairway St (unoccupied remodel of fire unit 140, Feb 12, 2024); 6010 Bluebell Cir (expedited review: new construction of a 2-story secondary apartment [2bed 2.5 bath] with attached carport, Nov 26, 2024).

How do I get alerts for new permits at 6021 Bluebell Cir?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78741
Email me when a new permit is filed