groundranger
Active · latest filing Oct 2026Residential

6208 Club Ter

Austin, TX 78741

Solar panels, battery and electrical upgrades at 6208 Club Ter

A solar system addition with a battery was permitted at this residence on May 2, 2025. Later City of Austin records show a main panel upgrade and Enphase controller installation permitted on October 28, 2026; that permit is marked Final.

Summarized from City of Austin records · updated Oct 28, 2026

Projects
4
4 filings
Latest filing
Oct 28, 2026
since Aug 19, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Main panel upgrade & install enphase controller as new main disconnect

  1. AppliedAug 26, 2025
  2. IssuedOct 28, 2026
  3. WorkOct '26 – Nov '26
  4. Final inspectionNov 5, 2026

Passed final inspection Nov 5, 2026.

1 contact on this project · 1 phone number

Permit & project history

4 projects
  1. Main panel upgrade & install enphase controller as new main disconnect

    Main panel upgrade & install enphase controller as new main disconnect

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Add on system & battery

    Add on system & battery

    City of Austin permitElectrical PermitWithdrawn
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Installation of pv solar system: new system (add-on): system size: 3.650 kw dc 2.900 kw ac module type & count: (10) q cells q.peak-duo-blk-ml-g9-365 inverter: (10) enphase energy iq8plus-72-2-us [240v] battery: (1) enphase encharge-10-1p-na controller: (1) iq controller 3 additional: (1) 100a backup panel existing system: module type & count: (26) hanwha o.cells q.peak duo blk -g10+ 365w inverter: (26) enphase iq8plus-72-2-us [240v] main service panel: (e) 125a bus with 125a mains

    Installation of pv solar system: new system (add-on): system size: 3.650 kw dc 2.900 kw ac module type & count: (10) q cells q.peak-duo-blk-ml-g9-365 inverter: (10) enphase energy iq8plus-72-2-us [240v] battery: (1) enphase encharge-10-1p-na controller: (1) iq controller 3 additional: (1) 100a backup panel existing system: module type & count: (26) hanwha o.cells q.peak duo blk -g10+ 365w inverter: (26) enphase iq8plus-72-2-us [240v] main service panel: (e) 125a bus with 125a mains

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Porfirio gonzalez - roof top solar install

    Porfirio gonzalez - roof top solar install

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 6208 Club Ter

What is being installed at 6208 Club Ter?

City of Austin records show a solar system addition with a battery, plus later electrical work for a main panel upgrade and Enphase controller.

When was the solar system permitted at 6208 Club Ter?

The solar system addition and battery were permitted May 2, 2025, under permit 2025-049679 EP, which is marked Final.

Is there a new solar battery at 6208 Club Ter?

The May 2, 2025 permit describes a solar system addition with one Enphase battery and an IQ controller. The permit is marked Final.

What electrical work was permitted at 6208 Club Ter in 2026?

Permit 2025-108165 EP, dated October 28, 2026, describes a main panel upgrade and installation of an Enphase controller as a new main disconnect. Its status is Final.

What is being installed near Jesuit House on Montopolis Drive?

At 6208 Club Ter, about 227 meters from Jesuit House, City of Austin records show solar equipment and electrical upgrades at a residence.

Was another electrical permit filed for 6208 Club Ter in May 2025?

Yes. Permit 2025-054558 EP, dated May 7, 2025, described an add-on system and battery, but its status is Withdrawn.

Also being built nearby

All of 78741

More solar installs in 78741.

Email me when a new permit is filed