5.1 kW rooftop solar permitted at 6320 El Mirando St

A 5.1 kW rooftop solar system is permitted for the existing residence at 6320 El Mirando St. The City of Austin issued permit 2026-045203 EP on May 1, 2026, and permit 2026-054180 EP on May 12 covers electrical work to connect the solar system and upgrade the main service panel.

Summarized from City of Austin records · updated May 12, 2026

Projects
2
2 filings
Latest filing
May 12, 2026
since May 1, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

Disconnect/reconnect power to tie in pv component and upgrading msp to _200__ amps. _125__ main breaker only. cox - 39-57490

  1. AppliedApr 30, 2026
  2. IssuedMay 12, 2026
  3. WorkMay '26 – Jul '26
  4. Final inspectionJul 8, 2026

Passed final inspection Jul 8, 2026.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Disconnect/reconnect power to tie in pv component and upgrading msp to _200__ amps. _125__ main breaker only. cox - 39-57490

    Disconnect/reconnect power to tie in pv component and upgrading msp to _200__ amps. _125__ main breaker only. cox - 39-57490

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Cox 39-57490 - install new _5.1__kw rooftop solar system to existing residential only using backfed breaker only

    Cox 39-57490 - install new _5.1__kw rooftop solar system to existing residential only using backfed breaker only

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 6320 El Mirando St

What is being built at 6320 El Mirando St?

Austin permits indicate a 5.1 kW rooftop solar system is being installed at the existing residence. A separate electrical permit covers connecting the system and upgrading the main service panel.

Is there a permit for rooftop solar at 6320 El Mirando St?

Yes. City of Austin permit 2026-045203 EP, dated May 1, 2026, covers a new 5.1 kW rooftop solar system.

When was the solar permit issued for 6320 El Mirando St?

The solar permit, 2026-045203 EP, is dated May 1, 2026. It is marked final.

What electrical work is planned at 6320 El Mirando St?

Permit 2026-054180 EP covers disconnecting and reconnecting power to tie in the solar system and upgrading the main service panel to 200 amps. The permit notes a 125-amp main breaker and is marked final.

How large is the solar system at 6320 El Mirando St?

The City of Austin permit describes a 5.1 kW rooftop solar system for the existing residence.

Are the permits for 6320 El Mirando St final?

Both Austin electrical permits are marked final: 2026-045203 EP, dated May 1, 2026, and 2026-054180 EP, dated May 12, 2026.