6802 Villita Avenida
Austin, TX 78741
Gas meter pull permitted at 6802 Villita Avenida
A gas permit to pull the meter at 6802 Villita Avenida was finalized on December 18, 2025. The City of Austin record does not describe a new building or provide a project size or valuation.
Summarized from City of Austin records · updated Dec 18, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 18, 2025
- since Dec 18, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledGas permit to pull meter
- AppliedDec 16, 2025
- IssuedDec 18, 2025
- WorkDec '25 – Dec '25
- Final inspectionDec 19, 2025
Passed final inspection Dec 19, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectGas permit to pull meter
Gas permit to pull meter
City of Austin permitPlumbing PermitFinal- Record
- 2025-159411 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6802 Villita Avenida
What is being built at 6802 Villita Avenida?
The City of Austin permit record describes a gas permit to pull the meter, not a new building project. The permit was finalized on December 18, 2025.
What work was permitted at 6802 Villita Avenida?
Permit 2025-159411 PP is for a gas meter pull. It is listed as a plumbing permit with final status.
When was the permit filed for 6802 Villita Avenida?
The permit was filed on December 18, 2025, and the record lists that same date as its latest filing.
Is a new home being built at 6802 Villita Avenida?
The available City of Austin record does not describe new home construction. It lists a gas permit to pull the meter.
How much will the work at 6802 Villita Avenida cost?
The record does not provide a project cost or reported valuation.
Also being built nearby
All of 78741- 6805 Villita AvenidaDec 12, 2025Replace 45ft cast iron pipes under the house. tunneling - there will be an access hole in the front and access in the back of the house. we will be working on the middle section of the home · 44 m away
- 6810 Villita AvenidaAug 17, 2026Repair or replace drain pipe and to city main · 60 m away
- 6809 Villita AvenidaMar 30, 2026Express: replace tub with walk in shower · 63 m away
- 901 Vasquez StMar 2, 2007Montopolis ballfields · 90 m away
- 6815 Villita AvenidaNov 13, 2025Express: replace tub to shower 1 piece refabricated acrylic no electrical work needed replace valve and new shower valve only working in wet space · 102 m away
- 907 Valdez StOct 21, 2024Replacement of an existing water heater · 108 m away
- 1003 Valdez StFeb 23, 2026Tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc · 132 m away
- 6831 Suena DrAug 4, 2025Replacement of complete existing central heat and air system with or without duct work · 140 m away
- 6829 Suena DrOct 23, 2024Replacement of an existing water heater · 143 m away
- 906 Valdez StJul 7, 2025Express - see attached (ramp) · 148 m away
- 6809 Suena DrJun 23, 2026Rebuild electrical service for a 150a main breaker service panel and 200a (ae) meter · 152 m away
- 916 Valdez StJan 28, 2025Express - add new siding and new window · 157 m away