7428 Cayenne Ln
Austin, TX 78741
7428 Cayenne Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 7428 Cayenne Ln, Austin, TX 78741. The most recent, filed April 22, 2025, covers: “Tunnel under the house at the front left corner of the house and follow the main drain line for 10 feet to make repairs”.
Compiled from City of Austin records · updated Apr 22, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Apr 22, 2025
- since Apr 22, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel under the house at the front left corner of the house and follow the main drain line for 10 feet to make repairs
- AppliedApr 19, 2025
- IssuedApr 22, 2025
- WorkApr '25 – Apr '25
- Final inspectionApr 29, 2025
Passed final inspection Apr 29, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectTunnel under the house at the front left corner of the house and follow the main drain line for 10 feet to make repairs
Tunnel under the house at the front left corner of the house and follow the main drain line for 10 feet to make repairs
City of Austin permitPlumbing PermitFinal- Record
- 2025-047925 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7428 Cayenne Ln
What is being built at 7428 Cayenne Ln?
The latest filing (City of Austin permit 2025-047925 PP, April 22, 2025) covers tunnel under the house at the front left corner of the house and follow the main drain line for 10 feet to make repairs.
How many permits and filings does 7428 Cayenne Ln have?
1 filing across 1 project, from April 22, 2025 to April 22, 2025.
Is there other construction near 7428 Cayenne Ln?
Yes. Nearby filings include 7429 Cayenne Ln (replacement of an existing water heater replace 50gal electric water heater, Aug 1, 2025); 7425 Cayenne Ln (replacement of complete existing central heat and air system with or without duct work, Oct 6, 2025); 7437 Cayenne Ln (replacement of complete existing central heat and air system with or without duct work, Sep 29, 2026).
How do I get alerts for new permits at 7428 Cayenne Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78741- 7429 Cayenne LnAug 1, 2025Replacement of an existing water heater replace 50gal electric water heater · 46 m away
- 7425 Cayenne LnOct 6, 2025Replacement of complete existing central heat and air system with or without duct work · 48 m away
- 7437 Cayenne LnSep 29, 2026Replacement of complete existing central heat and air system with or without duct work · 54 m away
- 1529 Poppy Seed LnFeb 3, 2026Replacement of an existing water heater replace 50-gallon electric water heater located in garage · 54 m away
- 7413 Cayenne LnAug 21, 2025Replacement of complete existing central heat and air system with or without duct work · 69 m away
- 1521 Poppy Seed LnOct 16, 2026Replace approximately 30ft of sewer line in the front yard from corner of the home to the area near the sidewalk where the city sewer connection is located · 73 m away
- 1701 Poppy Seed LnSep 25, 2025Express- foundation repair · 80 m away
- 1517 Poppy Seed LnOct 12, 2026Express: foundation repair · 84 m away
- 1604 Poppy Seed LnJul 16, 2026Install a new 50a circuit in the 150a main service panel and route wiring directly behind the main panel to the left interior garage wall install the nema 14-50 in an indoor-rated nema receptacle cover and box · 85 m away
- 1612 Poppy Seed LnMay 26, 2026Replacement of complete existing central heat and air system with or without duct work no duct work · 86 m away
- 1616 Coriander DrApr 15, 2024Express: replace 9 windows like for like · 88 m away
- 7513 Cayenne LnJan 25, 2024Express: fixing interior damage caused by fire. non-structural work fixing the roof same layout replacing same-sized windows and some sheetrock fixes including some insulation replacement · 89 m away