912 Bastrop Highway, Austin, TX 78742
Austin, TX 78742 · Inkuee & P, Inc.
Three metal buildings planned at 912 Bastrop Highway
A TDLR project registration filed May 30, 2024, describes plans for three pre-engineered metal core-and-shell buildings with individual tenant lease spaces at 912 Bastrop Highway. The project is listed at 37,100 square feet, with an applicant-estimated cost of $11,423,895; its review status is complete.
Summarized from Texas Department of Licensing and Regulation records · updated May 30, 2024
- Projects
- 1
- 1 filings
- Latest filing
- May 30, 2024
- since May 30, 2024
- Largest scope
- 37,100 sf
- Estimated cost
- $11M
- state registration
Where this project stands
Finishing up · inspection next912 Bastrop Hwy
37,100 sq ft · $11M est.
- RegisteredMay 30, 2024
- Plan review
- ConstructionAug '24 – Sep '25
- Inspectednow
- Closed
Scheduled to finish Sep 25, 2025; the state inspection hasn't been filed yet.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectThree core and shell, pre-engineered metal buildings with individual tenant lease spaces. — 912 bastrop
TDLR project registrationNew ConstructionReview Complete37,100 sq ft$11M est.- Project #
- TABS2024019695
- Tenant / owner
- 912 Bastrop Hwy
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 912 Bastrop Highway, Austin, TX 78742
What is being built at 912 Bastrop Highway in Austin?
A TDLR registration describes three pre-engineered metal core-and-shell buildings with individual tenant lease spaces. The registration lists the project as new construction.
When was the 912 Bastrop Highway project registered?
The project was registered with TDLR on May 30, 2024. Its registration number is TABS2024019695.
How big is the project at 912 Bastrop Highway?
The TDLR registration lists a project area of 37,100 square feet across the three buildings.
How much will the 912 Bastrop Highway project cost?
The applicant estimated the project cost at $11,423,895 in its TDLR registration. This is an estimate for the project, not a confirmed final cost.
What businesses are going into 912 Bastrop Highway?
The registration describes individual tenant lease spaces but does not name businesses that will occupy them.
Has the 912 Bastrop Highway project been approved?
The TDLR record lists the registration's status as “Review Complete.”
Also being built nearby
All of 78742- 912 Bastrop Hwy SbOct 7, 2026Metal roof repairs for existing office · 107 m away
- 912 Bastrop HwyApr 7, 2025Bastrop highway flex office · 107 m away
- 917 Bastrop Hwy SvrdMar 2, 2007Bergstrom open air market (with d & resubmittal of sp-96-0091d) · 183 m away
- 1115 Bastrop Hwy SvrdOct 20, 2026Demolition of an approximately 7800 sq ft warehouse and nightclub/bar structures currently unoccupied. structures circa 1967. 2026 089644 da - approved · 232 m away
- 821-1/2 Patton AveNov 6, 2026Patton avenue · 275 m away
- 830 Bastrop Hwy SbMay 28, 2024Demolition and removal of existing interior electrical equipment in outlined areas of work and installation of new interior lighting fixtures and controls within the same areas of work including egress lighting. *[plant 5] · 304 m away
- 917 Jet LnJun 9, 2025Total demolition of mobile home 2371 sq ft circa 1985 · 316 m away
- 1201 Bastrop Hwy SvrdApr 7, 2025Replacing current 32x78 glass of door to 1/4 gray lexan (tuffak gp) · 356 m away
- 810 Bastrop Hwy SbApr 29, 2026Connect mobile home with 6x8 deck 4x4 deck · 358 m away
- 831 Bastrop HwyJun 13, 2012Govalle tunnel centralized odor control facility · 374 m away
- 823 Patton AveNov 3, 2026Total demolition of 2 family dwelling 2158 sq ft circa 1979 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 388 m away
- 829 Bastrop HwyMar 2, 2007Anton park · 402 m away