2307 Dove Dr
Austin, TX 78744
2307 Dove Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 2307 Dove Dr, Austin, TX 78744. The most recent, filed March 1, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Mar 1, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Mar 1, 2024
- since Mar 1, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedFeb 29, 2024
- IssuedMar 1, 2024
- WorkMar '24 – Jul '24
- Final inspectionJul 3, 2024
Passed final inspection Jul 3, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-025785 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2307 Dove Dr
What is being built at 2307 Dove Dr?
The latest filing (City of Austin permit 2024-025785 MP, March 1, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 2307 Dove Dr have?
1 filing across 1 project, from March 1, 2024 to March 1, 2024.
Is there other construction near 2307 Dove Dr?
Yes. Nearby filings include 2402 Bending Trl (replacement of complete existing central heat and air system with or without duct work, May 7, 2026); 2303 Dove Dr (replacement of complete existing central heat and air system with or without duct work, Aug 12, 2024); 2404 Bending Trl (garage conversion into a bedroom, Apr 24, 2024).
How do I get alerts for new permits at 2307 Dove Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78744- 2402 Bending TrlMay 7, 2026Replacement of complete existing central heat and air system with or without duct work · 57 m away
- 2303 Dove DrAug 12, 2024Replacement of complete existing central heat and air system with or without duct work · 63 m away
- 2404 Bending TrlApr 24, 2024Garage conversion into a bedroom · 72 m away
- 2311 Bending TrlApr 16, 2026Express: replace 3 windows (like for like) · 81 m away
- 2307 Bending TrlApr 22, 2025Upgrade old weathered service like for like · 82 m away
- 2401 Bending TrlJul 7, 2026200amp meter 200amp disconnect · 85 m away
- 2410 Dove DrSep 3, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 2 ton vertical gas system · 117 m away
- 2315 Wagon Crossing PathMay 28, 2025Express - uninstall 3 existing windows and replace with 3 new windows of same size: like for like install · 174 m away
- 5701 Tallow Tree DrApr 9, 2024Replacement of complete existing central heat and air system with or without duct work · 200 m away
- 2507 Dove DrJul 30, 2026Installing 1. ev charger (hardwired) 2. 200a meter main panel (replacement) 3. 50a garage sub-panel (replacement) 4. whole-home surge protection device 5. 60a breaker 6. wire and conduit documents · 216 m away
- 2506 Dovemeadow DrMay 1, 2024Connecting dg solar to the grid · 219 m away
- 5701 Spoke CtApr 12, 2024Replace building sewer · 221 m away