groundranger
Recent · latest filing Jun 2025Commercial

4120 Commercial Center Dr

Austin, TX 78744

Suite reconfiguration and electrical work at 4120 Commercial Center Dr

Permits at 4120 Commercial Center Dr show interior work to divide suites 100 and 150, permitted October 8, 2024. A separate permit for a 200-amp electrical service for suite 150 was issued June 2, 2025; all three permits are listed as final.

Summarized from City of Austin records · updated Jun 2, 2025

Projects
3
3 filings
Latest filing
Jun 2, 2025
since Oct 8, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

**install 200 amp service for ste 150

  1. AppliedApr 2, 2025
  2. IssuedJun 2, 2025
  3. WorkJun '25 – May '26
  4. Final inspectionJul 13, 2026

Passed final inspection Jul 13, 2026.

1 contact on this project · 1 phone number

Permit & project history

3 projects
  1. **install 200 amp service for ste 150

    **install 200 amp service for ste 150

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Interior remodel - replace entry door - remove 2 doors between suite 100 and 150 to create a demising wall

    Interior remodel - replace entry door - remove 2 doors between suite 100 and 150 to create a demising wall

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Interior remodel - demising wall only suite 100

    Interior remodel - demising wall only suite 100

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 4120 Commercial Center Dr

What is being built at 4120 Commercial Center Dr?

City of Austin permits show interior suite reconfiguration and a 200-amp electrical service for suite 150. The records do not identify a new business or a specific use for the space.

What work was permitted at 4120 Commercial Center Dr in October 2024?

Two building permits dated October 8, 2024, cover an interior demising wall in suite 100 and work to create a demising wall between suites 100 and 150, including replacing an entry door and removing two doors.

What is the June 2025 permit for at 4120 Commercial Center Dr?

Electrical permit 2025-039589 EP, dated June 2, 2025, is for installing a 200-amp service for suite 150. Its status is listed as final.

Is a new tenant opening at 4120 Commercial Center Dr?

The permit records do not name a tenant or say whether a new business is opening.

Were the permits for 4120 Commercial Center Dr finalized?

Yes. The two building permits dated October 8, 2024, and the electrical permit dated June 2, 2025, are all listed as final.

What are the permit numbers for work at 4120 Commercial Center Dr?

The records list building permits 2024-130446 BP and 2024-130447 BP, both dated October 8, 2024, and electrical permit 2025-039589 EP, dated June 2, 2025.

Also being built nearby

All of 78744
Email me when a new permit is filed