4414 E St Elmo Rd
Austin, TX 78744
Foundation and plumbing repairs at 4414 E St Elmo Rd
Permits indicate repairs to the existing foundation and a defective drain at 4414 E St Elmo Rd. The City of Austin issued a building permit for foundation repair on May 20, 2026, followed by a plumbing permit for drain repairs on July 16, 2026.
Summarized from City of Austin records · updated Jul 16, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jul 16, 2026
- since May 20, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projects- diagnostic revealed a broken 4x2 wye for the mens restroom sinks. the wye is located under the main hallway. - plan of action is to apply for a permit with the customers jurisdiction to legally and professional proceed with repairs. - begin by utilizing specialized equipment to create a direct access entry hole located in the hallway. - this will expose noted diagnostic issues. - if additional access is needed a supplemented estimated will be provided. - if any more work is needed such as solid rock removal roots or any unforeseeable objects come across this estimate will be supplemented to accommodate the time/material needed to complete the job. - defective drains will be removed from plumbing system and debris will be hauled away. - drains will then be replaced with new dwv schedule 40 pvc pipe and fittings in accordance to plumbing code. - after work is completed we will then perform a static test on all the drain system to ensure there are no further leaks. - plumbing outfitters is not responsible for any cosmetic repairs included but not limited to irrigation repairs necessary sheet rock repairs or landscaping repairs. - plumbing outfitters is not responsible for damage to concealed water lines tension cable or rebar. these are considered unforeseen and cannot be avoided. all cautions will be taken to protect these areas. - foundation access will be inspected by an engineer to ensure foundation is sound after plumbing repair. customer will be provided with an engineer certification letter. if engineer determines additional or different materials are required for process of closing up the access hole this estimate will be supplemented to include necessary materials - during the inspection process any requirements by inspector in order to close permit that was outside the original scope of this work is not included on this estimate. - after city inspection passes a rough-concrete patch will be performed all aspects according to e
- diagnostic revealed a broken 4x2 wye for the mens restroom sinks. the wye is located under the main hallway. - plan of action is to apply for a permit with the customers jurisdiction to legally and professional proceed with repairs. - begin by utilizing specialized equipment to create a direct access entry hole located in the hallway. - this will expose noted diagnostic issues. - if additional access is needed a supplemented estimated will be provided. - if any more work is needed such as solid rock removal roots or any unforeseeable objects come across this estimate will be supplemented to accommodate the time/material needed to complete the job. - defective drains will be removed from plumbing system and debris will be hauled away. - drains will then be replaced with new dwv schedule 40 pvc pipe and fittings in accordance to plumbing code. - after work is completed we will then perform a static test on all the drain system to ensure there are no further leaks. - plumbing outfitters is not responsible for any cosmetic repairs included but not limited to irrigation repairs necessary sheet rock repairs or landscaping repairs. - plumbing outfitters is not responsible for damage to concealed water lines tension cable or rebar. these are considered unforeseen and cannot be avoided. all cautions will be taken to protect these areas. - foundation access will be inspected by an engineer to ensure foundation is sound after plumbing repair. customer will be provided with an engineer certification letter. if engineer determines additional or different materials are required for process of closing up the access hole this estimate will be supplemented to include necessary materials - during the inspection process any requirements by inspector in order to close permit that was outside the original scope of this work is not included on this estimate. - after city inspection passes a rough-concrete patch will be performed all aspects according to e
City of Austin permitPlumbing PermitFinal- Record
- 2026-090465 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Existing foundation repair as scope of work attached
Existing foundation repair as scope of work attached
City of Austin permitBuilding PermitFinal- Record
- 2026-064096 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4414 E St Elmo Rd
What is being built at 4414 E St Elmo Rd?
The permits describe repairs to an existing foundation and a defective drain, not a new building. The City of Austin issued permit 2026-064096 BP for foundation repair on May 20, 2026.
Is a new building going up at 4414 E St Elmo Rd?
The available permits indicate repair work at an existing property. They cover foundation repair and plumbing work, not new construction.
What plumbing work is planned at 4414 E St Elmo Rd?
Permit 2026-090465 PP, filed July 16, 2026, describes access to and replacement of defective drain piping beneath the main hallway near the men's restroom sinks.
When were permits filed for 4414 E St Elmo Rd?
The foundation repair building permit, 2026-064096 BP, was filed May 20, 2026. The plumbing permit, 2026-090465 PP, was filed July 16, 2026.
Are the permits for a new restaurant or business at 4414 E St Elmo Rd?
The permit records do not identify a new restaurant or business. They describe foundation and plumbing repairs.
Also being built nearby
All of 78744- 4509 E St Elmo RdSep 2, 2026Franklin park apartments building. 2 foundation repair installing 48 ext. and 28 int. pilings · 117 m away
- 4509 St Elmo RdMar 2, 2007Pleasant valley courtyards; smart housing · 117 m away
- 4511 St Elmo RdMar 2, 2007Pleasant valley courtyards; smart housing — pleasant valley courtyards; smart housing · 127 m away
- 4401 St Elmo RdSep 18, 2025American legion post · 148 m away
- 4410-1/2 Todd LnSep 5, 2014Southpark · 185 m away
- 4213 Todd LnMar 2, 2007Todd lane business park · 206 m away
- 4601 St Elmo RdMar 2, 2007King fisher creek subdivision — king fisher creek subdivision · 245 m away
- 4601 E St Elmo RdApr 10, 2026Replacement of complete existing central heat and air system with or without duct work replacing 2.5 ton wall mount air handler & 2.5 ton condenser · 245 m away
- 4211 Todd LnApr 16, 2009Todd lane business park, amended plat of lot 1 — todd lane business park amended · 260 m away
- 2609 St Elmo RdOct 26, 2026Elmo retail center · 299 m away
- 4201 Gregg Ward LnSep 1, 2026Replacement of complete existing central heat and air system with or without duct work · 317 m away
- 2600 St Elmo RdDec 7, 2018Robert madden industries - 2600 e. st. elmo rd · 326 m away