groundranger
Recent · latest filing Dec 2025Residential

4800 Spring Meadow Cv

Austin, TX 78744

Home repairs permitted at 4800 Spring Meadow Cv

Permits filed in December 2025 cover repairs to the home at 4800 Spring Meadow Cv, including replacing flooring and drywall, repairing the door frame and exterior siding, and leveling and repaving parts of the walkway and driveway. The City of Austin issued a building permit on December 1 and an electrical permit on December 30; both records are marked final.

Summarized from City of Austin records · updated Dec 30, 2025

Projects
2
2 filings
Latest filing
Dec 30, 2025
since Dec 1, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Express: replacement of baseboards floorboards and drywall. leveling and repaving of walkway in front door and portions of the driveway. grouting of foundation skirt. door frame repair. leveling of ac unit and exterior siding repair. ensure electrical work that was performed in the past is in accordance with code requirements

  1. AppliedDec 1, 2025
  2. IssuedDec 30, 2025
  3. WorkDec '25 – Jan '26
  4. Final inspectionJan 13, 2026

Passed final inspection Jan 13, 2026.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Express: replacement of baseboards floorboards and drywall. leveling and repaving of walkway in front door and portions of the driveway. grouting of foundation skirt. door frame repair. leveling of ac unit and exterior siding repair. ensure electrical work that was performed in the past is in accordance with code requirements

    Express: replacement of baseboards floorboards and drywall. leveling and repaving of walkway in front door and portions of the driveway. grouting of foundation skirt. door frame repair. leveling of ac unit and exterior siding repair. ensure electrical work that was performed in the past is in accordance with code requirements

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Express: replacement of baseboards floorboards and drywall. leveling and repaving of walkway in front door and portions of the driveway. grouting of foundation skirt. door frame repair. leveling of ac unit and exterior siding repair. ensure electrical work that was performed in the past is in accordance with code requirements

    Express: replacement of baseboards floorboards and drywall. leveling and repaving of walkway in front door and portions of the driveway. grouting of foundation skirt. door frame repair. leveling of ac unit and exterior siding repair. ensure electrical work that was performed in the past is in accordance with code requirements

    City of Austin permitBuilding PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 4800 Spring Meadow Cv

What is being built at 4800 Spring Meadow Cv?

The December 2025 permits describe repairs to an existing home, not a new building. Work includes replacing baseboards, floorboards and drywall, along with exterior and walkway repairs.

What repairs are planned at 4800 Spring Meadow Cv in Austin?

Permit 2025-152382 BP covers interior repairs, walkway and driveway work, foundation skirt grouting, door frame repair, AC unit leveling and exterior siding repair. It was filed December 1, 2025.

When was the permit filed for 4800 Spring Meadow Cv?

The City of Austin building permit, 2025-152382 BP, was filed December 1, 2025. An electrical permit for the same described work was filed December 30, 2025.

What does permit 2025-152382 EP cover?

The electrical permit record describes the home repair work and says previously performed electrical work is to be checked for code compliance. The permit was filed December 30, 2025, and is marked final.

Is a new house being built at 4800 Spring Meadow Cv?

The available City of Austin permits describe repairs to an existing home, not new construction. The building and electrical permit records are both marked final.

What is the status of the permits for 4800 Spring Meadow Cv?

The City of Austin records show the building permit filed December 1, 2025, and the electrical permit filed December 30, 2025, as final.

Also being built nearby

All of 78744
Email me when a new permit is filed