Permit filed for a handicap ramp at 4809 Cabob St
A City of Austin building permit indicates work on an express handicap ramp at 4809 Cabob St. The permit was filed on November 5, 2026, and is listed as active.
Summarized from City of Austin records · updated Nov 5, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Nov 5, 2026
- since Nov 5, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayExpress: handicap ramp
- AppliedNov 4, 2026
- IssuedNov 5, 2026
- WorkNov '26 – May '27
- Final inspection
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectExpress: handicap ramp
Express: handicap ramp
City of Austin permitBuilding PermitActive- Record
- 2026-146514 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4809 Cabob St
What is being built at 4809 Cabob St?
A City of Austin permit describes an express handicap ramp at the address.
When was the handicap ramp permit filed?
The permit was filed on November 5, 2026.
What is the permit number for 4809 Cabob St?
The City of Austin permit number is 2026-146514 BP.
Is the permit for a new building at 4809 Cabob St?
The listed permit is for an express handicap ramp, not a new building.
Is the 4809 Cabob St permit active?
Yes. The City of Austin lists permit 2026-146514 BP as active.
How much will the handicap ramp project cost?
The permit record does not report a project valuation or cost estimate.
Also being built nearby
All of 78744- 4807 Cabob StFeb 23, 2026200-amp underground service upgrade · 19 m away
- 4800 Cabob StDec 15, 2025Replacement of complete existing central heat and air system with or without duct work · 54 m away
- 4901 Cabob StAug 19, 2026Express: tub to tub and a tub to shower conversion · 57 m away
- 4913 Cabob StJul 22, 2025Excavate a 5 ft tunnel following clean out to expose 90 offsets · 65 m away
- 4900 Parell PathMay 19, 2025Excavate and replace approximately 25 feet of the building drain starting from the far side of the standing water inside the garage and extending past the concrete sidewalk attached to the home. approx. 20 feet of pipe replacement under concrete. approx. 5 feet of pipe replacement beyond concrete to provide adequate space for installing a homeowner clean-out. only working on sewer line · 67 m away
- 5502 Ferret PathAug 25, 2026Express: replace walk in shower · 96 m away
- 5515 Icon StOct 20, 2026Tunnel to repair sewer for 2 bathrooms kitchen and laundry room. repair water line/gas line · 100 m away
- 4912 Cabob StMar 16, 2026Express: foundation repair · 104 m away
- 4914 Cabob StMay 13, 2026New panel · 109 m away
- 4908 Cabob StFeb 24, 202510ft tunnel under slab to repair broken 90 by restroom · 111 m away
- 4709 Stassney LnApr 1, 2025Stassney retail center · 124 m away
- 5318 Atascosa DrNov 17, 2023Re- mounted meter can did not install any new equipment or make any changes to existing wiring. all original. emergengy repair permit per ae jeff diaz ec stated no espa was needed. 11/13/2023 · 142 m away