5000 Lark Creek Cv
Austin, TX 78744
5000 Lark Creek Cv: 1 project on record
City of Austin lists 1 filing across 1 project at 5000 Lark Creek Cv, Austin, TX 78744. The most recent, filed August 11, 2025, covers: “Upgrade main electric service and replace sub panel - underground”.
Compiled from City of Austin records · updated Aug 11, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 11, 2025
- since Aug 11, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledUpgrade main electric service and replace sub panel - underground
- AppliedAug 4, 2025
- IssuedAug 11, 2025
- WorkAug '25 – Sep '25
- Final inspectionSep 4, 2025
Passed final inspection Sep 4, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectUpgrade main electric service and replace sub panel - underground
Upgrade main electric service and replace sub panel - underground
City of Austin permitElectrical PermitFinal- Record
- 2025-097774 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5000 Lark Creek Cv
What is being built at 5000 Lark Creek Cv?
The latest filing (City of Austin permit 2025-097774 EP, August 11, 2025) covers upgrade main electric service and replace sub panel - underground.
How many permits and filings does 5000 Lark Creek Cv have?
1 filing across 1 project, from August 11, 2025 to August 11, 2025.
Is there other construction near 5000 Lark Creek Cv?
Yes. Nearby filings include 5406 Lark Creek Dr (morris - install new _8.6__kw rooftop solar system to existing residential only using line side tap, Jun 3, 2025); 5001 Lark Creek Cv (bathtub valve replacement only, Dec 23, 2025); 5308 Lark Creek Dr (replace water line in yard from meter to home. up to 100ft, Jun 2, 2025).
How do I get alerts for new permits at 5000 Lark Creek Cv?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78744- 5406 Lark Creek DrJun 3, 2025Morris - install new _8.6__kw rooftop solar system to existing residential only using line side tap · 45 m away
- 5001 Lark Creek CvDec 23, 2025Bathtub valve replacement only · 54 m away
- 5308 Lark Creek DrJun 2, 2025Replace water line in yard from meter to home. up to 100ft · 77 m away
- 5508 Lark Creek DrApr 3, 2024Replacement of an existing water heater · 111 m away
- 5411 Spring Meadow RdJan 7, 2026Excavate 20 tunnel to repair main drain line under house · 120 m away
- 5509 Teri RdApr 30, 2024Replacement of complete existing central heat and air system with or without duct work · 135 m away
- 5307 Teri RdSep 12, 2025Replacement of complete existing central heat and air system with or without duct work · 141 m away
- 5504 Meadow CrestJan 3, 2025Express: replacing 3 windows (like for like) · 147 m away
- 5500 Spring Meadow RdMay 20, 2024Express: tub to shower conversion 1. replace sub panel 2. replace gfci receptacle at the back porch with in use cover 3. install gfci for washer 4. replace master bathroom gfci 5. install (3) hardwired smike detectors and (1) combo per code 6. replace (3) motion lights one for one 7. replace garage fixture with customer provided led 8. re-wire and bypass and remove a tv switch then blank off the box · 180 m away
- 5000 Birch Creek RdJun 16, 2025Installationofapvsolarsystem · 183 m away
- 5302 Meadow CrestNov 18, 2024Express: siding repair · 186 m away
- 5608 Teri RdJun 2, 2026Dig a 3` x 3` entrance on the right side back corner of home and dig a 6 to 7 foot tunnel and redo all the branch lines in the master bathroom which includes one sink one bathtub and one toilet due to 6 to 7 foot belly · 195 m away