5004 Peppertree Pkwy
Austin, TX 78744
5004 Peppertree Pkwy: 1 project on record
City of Austin lists 1 filing across 1 project at 5004 Peppertree Pkwy, Austin, TX 78744. The most recent, filed September 26, 2025, covers: “Tunnel under slab to expose and replace bellied sewer line. trench on exterior to re-route sewer line to front yard and tie into city tap. tunnel access will be located in back yard of home”.
Compiled from City of Austin records · updated Sep 26, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 26, 2025
- since Sep 26, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel under slab to expose and replace bellied sewer line. trench on exterior to re-route sewer line to front yard and tie into city tap. tunnel access will be located in back yard of home
- AppliedSep 22, 2025
- IssuedSep 26, 2025
- WorkSep '25 – Dec '25
- Final inspectionDec 15, 2025
Passed final inspection Dec 15, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectTunnel under slab to expose and replace bellied sewer line. trench on exterior to re-route sewer line to front yard and tie into city tap. tunnel access will be located in back yard of home
Tunnel under slab to expose and replace bellied sewer line. trench on exterior to re-route sewer line to front yard and tie into city tap. tunnel access will be located in back yard of home
City of Austin permitPlumbing PermitFinal- Record
- 2025-120438 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5004 Peppertree Pkwy
What is being built at 5004 Peppertree Pkwy?
The latest filing (City of Austin permit 2025-120438 PP, September 26, 2025) covers tunnel under slab to expose and replace bellied sewer line. trench on exterior to re-route sewer line to front yard and tie into city tap. tunnel access will be located in back yard of home.
How many permits and filings does 5004 Peppertree Pkwy have?
1 filing across 1 project, from September 26, 2025 to September 26, 2025.
Is there other construction near 5004 Peppertree Pkwy?
Yes. Nearby filings include 5101 Peppertree Pkwy (sewer rebuild. spot repair up to 5ft. up to 3ft deep. not tunneling under foundation per contractor, Jun 18, 2024); 5001 Pepper Ln (express: existing foundation repair as per scope of work attached, Jun 5, 2024); 2014 Teri Rd (express: foundation repair, May 31, 2024).
How do I get alerts for new permits at 5004 Peppertree Pkwy?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78744- 5101 Peppertree PkwyJun 18, 2024Sewer rebuild. spot repair up to 5ft. up to 3ft deep. not tunneling under foundation per contractor · 55 m away
- 5001 Pepper LnJun 5, 2024Express: existing foundation repair as per scope of work attached · 83 m away
- 2014 Teri RdMay 31, 2024Express: foundation repair · 121 m away
- 2201 Palmera CvFeb 11, 2026Replacement of complete existing central heat and air system with or without duct work system replacement · 141 m away
- 2101 Donahue LnAug 10, 2026New manufactured home 3/2 · 152 m away
- 2205 Palmera CvAug 5, 2024Installation of sewage pump and replacement of sewer line · 156 m away
- 2207 Palmera CvJul 1, 2025Emergency - gas company locked meter and need permit approved asap. new shut off for gas line for stove per code & gas line for furnace drip leg · 165 m away
- 2212 Palmera CvFeb 21, 2025Roof top solar · 183 m away
- 5124 Pepper LnMar 14, 2024Repair and replace meter socket. the underground conduit riser pipe has separated from the meter socket and the feeder wires are exposed. this needs to be repaired asap · 185 m away
- 2102 Ponciana LoopMay 23, 2025Relocate service from existing structure to stand alone rack install new meter for adu to rack. trench power back to 2102 ponciana loop and 2102 ponciana loop unit 2 from rack. ae customer in aid to construction recovery fee was paid on permit # 2023 160132 ep · 184 m away
- 2102 Donahue LnJul 23, 2025Carport enclosure · 198 m away
- 2216 Palmera CvApr 25, 2024Express: remodel two walk in showers · 218 m away