5005 Acorn Grove Ct
Austin, TX 78744
5005 Acorn Grove Ct: 2 projects on record
City of Austin lists 2 filings across 2 projects at 5005 Acorn Grove Ct, Austin, TX 78744. The most recent, filed June 25, 2025, covers: “Tunnel to make multiple spot repairs on the sewer line **the tunnel is 65 feet and access is in the front yard left side”.
Compiled from City of Austin records · updated Jun 25, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Jun 25, 2025
- since Jun 25, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel to make multiple spot repairs on the sewer line **the tunnel is 65 feet and access is in the front yard left side
- AppliedJun 23, 2025
- IssuedJun 25, 2025
- WorkJun '25 – Jul '25
- Final inspectionJul 9, 2025
Passed final inspection Jul 9, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsTunnel to make multiple spot repairs on the sewer line **the tunnel is 65 feet and access is in the front yard left side
Tunnel to make multiple spot repairs on the sewer line **the tunnel is 65 feet and access is in the front yard left side
City of Austin permitPlumbing PermitFinal- Record
- 2025-078130 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2023-089021 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5005 Acorn Grove Ct
What is being built at 5005 Acorn Grove Ct?
The latest filing (City of Austin permit 2025-078130 PP, June 25, 2025) covers tunnel to make multiple spot repairs on the sewer line **the tunnel is 65 feet and access is in the front yard left side.
How many permits and filings does 5005 Acorn Grove Ct have?
2 filings across 2 projects, from June 25, 2025 to June 25, 2025.
Is there other construction near 5005 Acorn Grove Ct?
Yes. Nearby filings include 5006 Acorn Grove Ct (replacement of an existing water heater, Oct 29, 2025); 5805 Lark Creek Dr (we will be excavating roughly 30 feet from the front cleanout to reach the toilet lines for repairs, Sep 14, 2026); 5000 Acorn Grove Ct (express: tub-to-shower conversion siding replacement window replacement (like for like), Jun 4, 2024).
How do I get alerts for new permits at 5005 Acorn Grove Ct?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78744- 5006 Acorn Grove CtOct 29, 2025Replacement of an existing water heater · 42 m away
- 5805 Lark Creek DrSep 14, 2026We will be excavating roughly 30 feet from the front cleanout to reach the toilet lines for repairs · 51 m away
- 5000 Acorn Grove CtJun 4, 2024Express: tub-to-shower conversion siding replacement window replacement (like for like) · 62 m away
- 5806 Teri RdSep 4, 2024Replacement of complete existing central heat and air system with or without duct work · 106 m away
- 5716 Meadow CrestMay 1, 2026Express: foundation repair - install 13 push piers · 115 m away
- 5805 Teri RdApr 1, 2026New install (foundation drip) · 116 m away
- 5712 Meadow CrestAug 17, 2026Tunnel to replace drains 30 ft tunnel with two access points · 124 m away
- 5802 Walnut Hollow CvMar 17, 2026Express: foundation repair · 128 m away
- 5804 Walnut Hollow CvMay 31, 2024Express: replace two exhaust fans one in each bathroom convert the tub shower to a walk-in shower and replace the walls and sheetrock only to install hardie backer for the tile new drain new valve new shower head · 132 m away
- 5807 Teri RdDec 27, 202355 foot drain replacement · 137 m away
- 5708 Meadow CrestJan 23, 2026Replacement of an existing water heater 40gal gas tank located in the garage · 140 m away
- 5700 Teri RdOct 20, 2026Excavate 10 tunnel to repair main drain line under house · 146 m away