5408 Village Ln
Austin, TX 78744
Drain-line repairs permitted at 5408 Village Ln
A City of Austin permit indicates work below the foundation to repair the main and master-bath drain lines at 5408 Village Ln. The plumbing permit was filed December 24, 2025, and is marked final; the records provided do not list a new building project.
Summarized from City of Austin records · updated Dec 24, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Dec 24, 2025
- since Dec 24, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled15 tunnel below the foundation to repair main and master bath drain lines. 2 access holes - right left
- AppliedDec 8, 2025
- IssuedDec 24, 2025
- WorkDec '25 – Feb '26
- Final inspectionFeb 6, 2026
Passed final inspection Feb 6, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projects15 tunnel below the foundation to repair main and master bath drain lines. 2 access holes - right left
15 tunnel below the foundation to repair main and master bath drain lines. 2 access holes - right left
City of Austin permitPlumbing PermitFinal- Record
- 2025-155682 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitExpired- Record
- 2023-063623 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5408 Village Ln
What is happening at 5408 Village Ln in Austin?
A City of Austin plumbing permit indicates tunnel work below the foundation to repair the main and master-bath drain lines. Permit 2025-155682 PP was filed December 24, 2025, and is marked final.
Is a new home being built at 5408 Village Ln?
The records provided do not list a new-home project. They show a plumbing permit for drain-line repairs below the foundation.
What plumbing work is planned at 5408 Village Ln?
The permit description says the work is to repair the main and master-bath drain lines, with two access holes. Permit 2025-155682 PP is marked final.
When was the 5408 Village Ln plumbing permit filed?
The City of Austin filed permit 2025-155682 PP on December 24, 2025.
Is the permit for 5408 Village Ln final?
Yes. The City of Austin lists plumbing permit 2025-155682 PP as final.
Was an HVAC permit also filed at 5408 Village Ln?
A mechanical permit filed June 1, 2023, described replacement of the existing central heat-and-air system, with or without duct work. That permit is marked expired.
Also being built nearby
All of 78744- 4505 E Stassney LnMay 20, 2024Rebuild main service to new 200 amp service · 38 m away
- 5504 Village LnMar 12, 2025Replacing about 65-70 ft of main water line in front yard · 56 m away
- 5403 Village LnNov 8, 2024Express: fire damage repair revision 1: add pp · 58 m away
- 5400 Village LnDec 21, 2023Foundation repair · 65 m away
- 5410 S Pleasant Valley RdMar 25, 2025Express: tub shower conversion replace water heater · 92 m away
- 4504 Southwest DrMar 5, 2025Express: foundation repair · 109 m away
- 4603 Southeast DrAug 25, 2025Express: foundation repair · 119 m away
- 5407 Village TrlDec 8, 2023Replacement of an existing water heater · 129 m away
- 5405 Pleasant Valley RdJun 7, 2007Pleasant valley plaza · 135 m away
- 5310 Pleasant Valley RdOct 4, 2007Pleasant valley pointe — pleasant valley pointe · 153 m away
- 4602 E Village CtOct 21, 2025Upgrade main service disconnect replace meter socket and 200 amp main panel · 155 m away
- 2523 E Stassney LnMar 28, 2024Electrical service brought up nec standards · 158 m away