HVAC system and water heater replacements at 5430 Walnut Grove Dr
City of Austin permits indicate replacement of the existing central heating and air system and a 50-gallon natural-gas water heater at 5430 Walnut Grove Dr. The water-heater permit was filed May 5, 2026, and the mechanical permit was filed July 2, 2026; both are marked final.
Summarized from City of Austin records · updated Jul 2, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jul 2, 2026
- since May 5, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedApr 3, 2019
- IssuedJul 2, 2026
- WorkJul '26 – Jul '26
- Final inspectionJul 14, 2026
Passed final inspection Jul 14, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2019-050132 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of an existing water heater replace existing water heater with one 50-gallon standard natural-gas water heater (plumbing change-out); no structural change
Replacement of an existing water heater replace existing water heater with one 50-gallon standard natural-gas water heater (plumbing change-out); no structural change
City of Austin permitPlumbing PermitFinal- Record
- 2026-053358 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5430 Walnut Grove Dr
What is being built at 5430 Walnut Grove Dr?
The City of Austin records show replacement work on the existing central heating and air system and water heater, not a new building. The permits are marked final.
Is a new home being built at 5430 Walnut Grove Dr?
The records provided show permits for replacing existing home systems, with no new-home construction listed.
What HVAC work is permitted at 5430 Walnut Grove Dr?
Permit 2019-050132 MP covers replacement of the complete existing central heat and air system, with or without duct work. It was filed July 2, 2026, and is marked final.
Is the water heater being replaced at 5430 Walnut Grove Dr?
Yes. Permit 2026-053358 PP covers replacing the existing water heater with a 50-gallon standard natural-gas water heater, with no structural change. It was filed May 5, 2026, and is marked final.
When were the permits for 5430 Walnut Grove Dr filed?
The water-heater permit was filed May 5, 2026. The mechanical permit for the central heating and air system was filed July 2, 2026.
Also being built nearby
All of 78744- 5933 Red Bud Ridge LnMar 16, 2026Replace 50 gallon electric water heater · 32 m away
- 5929 Red Bud Ridge LnJul 22, 2026Install ev charger outlet in garage.the main panel is on right side of the building. the charger outlet is located on the right side of the garage wall. the charger outlet is protected by a gfi breaker · 33 m away
- 5438 Walnut Grove DrMar 16, 2026Replacement of an existing water heater replace ng water heater · 37 m away
- 5928 Red Bud Ridge LnNov 16, 2023Express: foundation repair · 52 m away
- 5413 Walnut Grove DrJun 19, 2025200a ug service upgrade emergent feeder conduit has broken off bottom of main exterior panel on home not secured and bent main breaker down almost detached from bus bar. will pull in new 200a ug feeder for slack new 200a panel and bend and secure ug riser and strut strap to wall with slip meter riser to allow for potential future expansion or erosion · 75 m away
- 5416 Walnut Grove DrSep 10, 202410 tunnel to replace section of sewer line under slab · 76 m away
- 5224 Walnut Grove CtSep 3, 2026Replacing some of the dwv piping under the home due to a couple of bellied lines and a break in line · 77 m away
- 5510 Bradford Pear LnFeb 18, 2026Disconnect/reconnect to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size · 80 m away
- 5513 Bradford Pear LnMar 6, 2025Replacement of complete existing central heat and air system with or without duct work · 86 m away
- 5901 Red Bud Ridge LnSep 30, 2025(lara cruz) - installation of circuit for elec. vehicle charging station - esip · 89 m away
- 5908 Red Bud Ridge LnSep 22, 2025Replacement of complete existing central heat and air system with or without duct work · 90 m away
- 5514 Bradford Pear LnSep 22, 2025Replacement of complete existing central heat and air system with or without duct work · 92 m away