Level 2 EV charger permit filed at 6701 San Isidro Dr

A City of Austin electrical permit filed December 29, 2025, covers installation of a Level 2 EV charger at 6701 San Isidro Dr. The permit specifies a 60-amp circuit breaker and a charger drawing 48 amps continuously. The permit status is Final.

Summarized from City of Austin records · updated Dec 29, 2025

Projects
1
1 filings
Latest filing
Dec 29, 2025
since Dec 29, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <5 feet new 3/4 emt conduit to power the level 2 ev charger at 48amp constant draw

  1. AppliedDec 26, 2025
  2. IssuedDec 29, 2025
  3. WorkDec '25 – Jun '26
  4. Final inspectionJun 1, 2026

Passed final inspection Jun 1, 2026.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <5 feet new 3/4 emt conduit to power the level 2 ev charger at 48amp constant draw

    Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <5 feet new 3/4 emt conduit to power the level 2 ev charger at 48amp constant draw

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 6701 San Isidro Dr

What is being built at 6701 San Isidro Dr?

A City of Austin electrical permit covers installation of a Level 2 EV charger. The permit was filed December 29, 2025, under number 2025-162299 EP.

Is an EV charger being installed at 6701 San Isidro Dr?

Yes. Permit 2025-162299 EP describes a Level 2 EV charger powered by a 60-amp circuit breaker.

How much power will the charger at 6701 San Isidro Dr use?

The permit describes a 48-amp constant draw, supplied by a 60-amp circuit breaker.

When was the EV charger permit filed in Austin?

The City of Austin filed electrical permit 2025-162299 EP on December 29, 2025. Its listed status is Final.

What is the project cost for the EV charger at 6701 San Isidro Dr?

The permit record does not list a project valuation or cost.