6810-1/2 Colton Bluff Springs Rd
Austin, TX 78744
Offsite wastewater improvements planned for Thaxton Road tract
A City of Austin site-plan case covers offsite wastewater improvements for the Thaxton Road tract at 6810-1/2 Colton Bluff Springs Road. The case was approved and released on January 9, 2026.
Summarized from City of Austin records · updated Jan 9, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jan 9, 2026
- since Jan 9, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 6810-1/2 Colton Bluff Springs Rd
What is being built at 6810-1/2 Colton Bluff Springs Road?
A City of Austin site-plan case covers offsite wastewater improvements for the Thaxton Road tract. The record does not describe a building.
When was the wastewater project at 6810-1/2 Colton Bluff Springs Road permitted?
The City of Austin case was filed on January 9, 2026, and is listed as approved and released.
What is the permit number for the Thaxton Road tract improvements?
The City of Austin case number is 12154021. It is titled “Thaxton Road Tract Offsite Wastewater Improvements.”
Is the Thaxton Road tract wastewater plan approved?
Yes. The City of Austin record lists case 12154021 as approved and released on January 9, 2026.
How much will the wastewater improvements at this address cost?
The City of Austin case does not list a project cost.
How large is the project at 6810-1/2 Colton Bluff Springs Road?
The record does not provide a project square footage.
Also being built nearby
All of 78744- 6837-1/2 Colton Bluff Springs RdJul 24, 2026Colton bluff springs road phase 1/1a lift station · 124 m away
- 7925 Springfield DrFeb 26, 2026Replacement of complete existing central heat and air system with or without duct work install replacement of 4 ton heat pump · 160 m away
- 7632 Knockfin DrMay 7, 2026Replacement of complete existing central heat and air system with or without duct work hvac change out · 192 m away
- 6737 Marble Creek LoopOct 12, 2026Replacement of complete existing central heat and air system with or without duct work · 195 m away
- 6716 Piedras Blanco DrOct 2, 2024Roof top solar · 206 m away
- 7816 Springfield DrJan 27, 2026Replacement of an existing water heater change out: install/ replace 50 gallon electric tank-type water heater · 225 m away
- 6712 Roseborough DrOct 13, 2025New inground pool and spa with reqd enclosure device for existing 2-story sfr · 226 m away
- 7629 Marble Ridge DrJan 9, 2024Replacement of complete existing central heat and air system with or without duct work · 233 m away
- 6713 Piedras Blanco DrApr 6, 2026Replacement of an existing water heater replace 50-gallon electric water heater located in laundry room · 237 m away
- 7812 Springfield DrMay 6, 2026Express - existing foundation repair · 241 m away
- 6708 Roseborough DrOct 1, 2024Replacement of complete existing central heat and air system with or without duct work · 246 m away
- 6712 Marble Creek LoopApr 6, 2026Express: tub to shower conversion in hall bathroom · 247 m away