6824-1/2 William Cannon Dr
Austin, TX 78744
6824-1/2 William Cannon Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 6824-1/2 William Cannon Dr, Austin, TX 78744. The most recent, filed May 25, 2018, covers: “Springfield multifamily, amended final plat”.
Compiled from City of Austin records · updated May 25, 2018
- Projects
- 1
- 1 filings
- Latest filing
- May 25, 2018
- since May 25, 2018
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 6824-1/2 William Cannon Dr
What is being built at 6824-1/2 William Cannon Dr?
The latest filing (City of Austin case 11872558, May 25, 2018) covers springfield multifamily, amended final plat.
How many permits and filings does 6824-1/2 William Cannon Dr have?
1 filing across 1 project, from May 25, 2018 to May 25, 2018.
What is being built near Mckinney Falls Associates, in Austin?
6824-1/2 William Cannon Dr is about 176 m from Mckinney Falls Associates, (7009 E William Canon Dr). Its latest filing is for springfield multifamily, amended final plat.
Is there other construction near 6824-1/2 William Cannon Dr?
Yes. Nearby filings include 6808 Ondantra Bnd (replacement of complete existing central heat and air system with or without duct work, Dec 10, 2025); 6908 Ondantra Bnd (express: replacing 1 window like for like in existing residential area, Sep 17, 2026); 6912 Ondantra Bnd (***timed virtual inspection: 06/22/2026 @ 10 am*** replacement of complete existing central heat and air system with or without duct work, Jun 5, 2026).
How do I get alerts for new permits at 6824-1/2 William Cannon Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78744- 6808 Ondantra BndDec 10, 2025Replacement of complete existing central heat and air system with or without duct work · 101 m away
- 6908 Ondantra BndSep 17, 2026Express: replacing 1 window like for like in existing residential area · 109 m away
- 6912 Ondantra BndJun 5, 2026***timed virtual inspection: 06/22/2026 @ 10 am*** replacement of complete existing central heat and air system with or without duct work · 124 m away
- 6720 Ondantra BndAug 22, 2026Relocating of a 120v electrical outlet · 136 m away
- 6916 Ondantra BndApr 17, 2024New pool & spa with a concrete deck for 2-story sfr with a fence 4 in height max 4 opening gates must be equipped with self-closing and self-latching device required · 138 m away
- 6910 William Cannon DrAug 9, 2022Del valle isd hillcrest elementary canopy renovations · 156 m away
- 7009 E William Canon Dr · Mckinney Falls Associates, LLCMar 10, 2026Heartland dental - austin, tx — renovation/alteration — first generation tenant improvement in an existing shell building · 176 m away
- 7106 Janes Ranch RdJun 29, 2017Springfield multifamily · 186 m away
- 6717 Ondantra BndJun 6, 2024Replacement of complete existing central heat and air system with or without duct work · 191 m away
- 7216 Kilday CvJun 10, 2025Install (1) 50 amp 240v electric heater circuit for exterior barrel sauna. the sauna is 36 square foot. the sauna will not be installed in a flood plain · 195 m away
- 7005 Ondantra BndJul 25, 2025Replacement of furnace only 4t-ahu-14s-ss (4ton air handler only) · 201 m away
- 7300 Kilday CvAug 17, 2026New pool · 209 m away