7205 Garnet Mill Ln
Austin, TX 78744
Electrical permit filed for an EV installation in Austin
An electrical permit for an EV installation was filed at 7205 Garnet Mill Ln in Austin on October 9, 2025. The City of Austin record lists permit 2025-128232 EP as final.
Summarized from City of Austin records · updated Oct 9, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Oct 9, 2025
- since Oct 9, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledEv install
- AppliedOct 3, 2025
- IssuedOct 9, 2025
- WorkOct '25 – Nov '25
- Final inspectionNov 13, 2025
Passed final inspection Nov 13, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectEv install
Ev install
City of Austin permitElectrical PermitFinal- Record
- 2025-128232 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7205 Garnet Mill Ln
What is being installed at 7205 Garnet Mill Ln?
A City of Austin electrical permit describes the work as an EV installation. The record does not provide further details about the installation.
When was the EV installation permit filed?
The permit was filed on October 9, 2025.
What is the permit number for 7205 Garnet Mill Ln?
The City of Austin permit number is 2025-128232 EP.
Is the permit for the EV installation final?
Yes. The City of Austin record lists permit 2025-128232 EP as final.
How much will the EV installation cost?
The City of Austin record does not report a valuation for the permit.
Also being built nearby
All of 78744- 7113 Garnet Mill LnOct 22, 2026New pool spa and concrete deck utilize existing equipment and gas/electric lines · 37 m away
- 7200 Auburn Blaze LnSep 29, 2026Demolition existing pool and re-build pool spa and concrete deck 372 sq ft pool and 39 sq ft spa · 47 m away
- 7118 Auburn Blaze LnMar 20, 2026Water heater like for like · 59 m away
- 7218 Auburn Blaze LnAug 5, 2026Full system replacement · 73 m away
- 7008 Garnet Mill LnJul 15, 2024New inground pool with concrete decking · 140 m away
- 7336-1/2 William Cannon DrSep 25, 2015Bryant park · 159 m away
- 7016 Cardinal Bloom LoopOct 17, 2024Replacement of complete existing central heat and air system with or without duct work · 163 m away
- 7000 Auburn Blaze LnJan 21, 2022Mirabel park, phase 2 easton park section 2c - construction plans · 194 m away
- 7228 Cardinal Bloom LoopSep 30, 2024Run new wire for shed on pic pipe under ground and install small panel 6 spaces · 204 m away
- 7100 Cardinal Bloom LoopSep 16, 2026Gas test. home been without gas for sometime. gas company request gas test be performed · 224 m away
- 7104 Cardinal Bloom LoopSep 23, 2024Replacement of complete existing central heat and air system with or without duct work · 227 m away
- 7333-1/2 William Cannon DrFeb 23, 2024Easton park section 1b — streets, drainage, utility and associated improvements · 250 m away