7511 Grand Linden Way
Austin, TX 78744
7511 Grand Linden Way: 2 projects on record
City of Austin lists 2 filings across 2 projects at 7511 Grand Linden Way, Austin, TX 78744 since March 11, 2025. The most recent, filed April 3, 2025, covers: “New wall construction to partition the game room from the corridor on the second floor. new door and proper transfer venting included. moving an electrical switch”.
Compiled from City of Austin records · updated Apr 3, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Apr 3, 2025
- since Mar 11, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledNew wall construction to partition the game room from the corridor on the second floor. new door and proper transfer venting included. moving an electrical switch
- AppliedFeb 13, 2025
- IssuedApr 3, 2025
- WorkApr '25 – Apr '25
- Final inspectionApr 4, 2025
Passed final inspection Apr 4, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsNew wall construction to partition the game room from the corridor on the second floor. new door and proper transfer venting included. moving an electrical switch
New wall construction to partition the game room from the corridor on the second floor. new door and proper transfer venting included. moving an electrical switch
City of Austin permitElectrical PermitFinal- Record
- 2025-036658 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New wall construction to partition the game room from the corridor on the second floor. new door and proper transfer venting included
New wall construction to partition the game room from the corridor on the second floor. new door and proper transfer venting included
City of Austin permitBuilding PermitFinal- Record
- 2025-027086 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7511 Grand Linden Way
What is being built at 7511 Grand Linden Way?
The latest filing (City of Austin permit 2025-036658 EP, April 3, 2025) covers new wall construction to partition the game room from the corridor on the second floor. new door and proper transfer venting included. moving an electrical switch.
How many permits and filings does 7511 Grand Linden Way have?
2 filings across 2 projects, from March 11, 2025 to April 3, 2025.
Is there other construction near 7511 Grand Linden Way?
Yes. Nearby filings include 7105 Terrazzo Cottage Ct (johnson install new/additional _10.950__kw rooftop solar system to existing residential only using line side tap. utility company - __blubonnet___, Feb 14, 2024); 7231 Colton Bluff Springs Rd (colton bluff phase 1a, Mar 27, 2026); 7308 Travertine Spring (not pre-plumbed water softener install, Oct 15, 2024).
How do I get alerts for new permits at 7511 Grand Linden Way?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78744- 7105 Terrazzo Cottage CtFeb 14, 2024Johnson install new/additional _10.950__kw rooftop solar system to existing residential only using line side tap. utility company - __blubonnet___ · 118 m away
- 7231 Colton Bluff Springs RdMar 27, 2026Colton bluff phase 1a · 136 m away
- 7308 Travertine SpringOct 15, 2024Not pre-plumbed water softener install · 143 m away
- 7401 Chesapeake Rail LnNov 27, 2023New solar panels on new solar system. installation of solar panels on existing residential roof. 3.36 kw 8 panels · 155 m away
- 7110 Summer Tanager DrJun 10, 2024Disconnect/reconnect power to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size. bluebonnet service · 171 m away
- 7304 Harmony Shoals BndSep 23, 2026Ev charger installation · 183 m away
- 7417 Mc Kinney Falls PkwyFeb 11, 2019Easton park section 1b, lot 3 · 198 m away
- 7201 Dunant WayNov 17, 2026Mckinney dunant union · 216 m away
- 7310 Tuely TrlMar 17, 2026Work consist of installing a sprinkler system to an existing residental home in austin tx. system will contain a tototal of 5 zones · 223 m away
- 7405 Travertine SpringJun 29, 2025Replacement of complete existing central heat and air system with or without duct work · 232 m away
- 7316 Harmony Shoals BndOct 20, 2026Level 2 ev charger · 236 m away
- 7407 Travertine SpringOct 29, 202511.31kw solar + 1 powerwall 3 battery · 246 m away