7606-1/2 Colton Bluff Springs Rd
Austin, TX 78744
Cottonmouth Creek wastewater interceptor site plan approved
A site-plan case for Cottonmouth Creek Wastewater Interceptor Phase A was approved and released on May 23, 2025. The City of Austin record does not list a project area or cost.
Summarized from City of Austin records · updated May 23, 2025
- Projects
- 3
- 3 filings
- Latest filing
- May 23, 2025
- since Jan 12, 2017
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Austin
Questions about 7606-1/2 Colton Bluff Springs Rd
What is being built at 7606-1/2 Colton Bluff Springs Rd?
A City of Austin site-plan case is listed for Cottonmouth Creek Wastewater Interceptor Phase A. The case was approved and released on May 23, 2025.
When was the Cottonmouth Creek wastewater interceptor project permitted?
The site-plan case, 11683291, was filed on May 23, 2025, and is marked Approved and Released.
Is construction underway at 7606-1/2 Colton Bluff Springs Rd?
The record shows an approved and released site-plan case, but does not state whether construction has started.
How much will the Cottonmouth Creek interceptor project cost?
The available City of Austin case record does not list a project cost.
Was there an earlier Cottonmouth Creek project at this address?
Yes. A Cottonmouth Creek Restoration Project site-plan case, 11460928, was filed on January 12, 2017. Its status is Expired.
Is the Easton Park Sec 1B Lot 4A site plan still active?
No. The City of Austin case, 12139558, was filed on March 24, 2020, and is marked Expired.
Also being built nearby
All of 78744- 7610-1/2 Colton Bluff Springs RdFeb 3, 2017Cottonmouth creek wastewater interceptor phase a · 32 m away
- 7514-1/2 Colton Bluff Springs RdOct 24, 2025Union park lane extension and improvements · 99 m away
- 7033 Union Park LnFeb 7, 2025Easton park section 1b lot 4a-3 park · 152 m away
- 7505 Harmony Shoals BndApr 20, 2026Replacement of an existing water heater we are swapping the old gas tankless water heater for a similar model · 220 m away
- 7600 Solari DrFeb 25, 2022Easton park section 2a · 235 m away
- 7604 Solari DrAug 26, 2024Easton park section 1c phase 3 · 243 m away
- 7418 Harmony Shoals BndDec 4, 2023Installing 22 405-watt solar panels roof-mounted residential for a dc system size of 8.910 kw dc · 268 m away
- 7600 Dylan DrJun 30, 2026Replacement of complete existing central heat and air system with or without duct work hvac change out only · 299 m away
- 7407 Travertine SpringOct 29, 202511.31kw solar + 1 powerwall 3 battery · 315 m away
- 7803 Douvaine DrAug 1, 2024Installation of roof mounted solar panels. energy provider is blue bonnet · 315 m away
- 7405 Travertine SpringJun 29, 2025Replacement of complete existing central heat and air system with or without duct work · 326 m away
- 7805 Douvaine DrMar 9, 2026Install dedicated electrical circuits from existing main panel to exterior sauna and cold plunge equipment. no meter work. no service disconnect/reconnect · 327 m away