7809 Ben White Blvd Svrd
Austin, TX 78744
7809 Ben White Blvd Svrd: 4 projects on record
City of Austin lists 4 filings across 4 projects at 7809 Ben White Blvd Svrd, Austin, TX 78744. The most recent, filed March 2, 2007, covers: “Exxon tigermart”.
Compiled from City of Austin records · updated Mar 2, 2007
- Projects
- 4
- 4 filings
- Latest filing
- Mar 2, 2007
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsSources: City of Austin
Questions about 7809 Ben White Blvd Svrd
What is being built at 7809 Ben White Blvd Svrd?
The latest filing (City of Austin case 230884, March 2, 2007) covers exxon tigermart.
How many permits and filings does 7809 Ben White Blvd Svrd have?
4 filings across 4 projects, from March 2, 2007 to March 2, 2007.
Is there other construction near 7809 Ben White Blvd Svrd?
Yes. Nearby filings include 8 Olmos Dr (move and set new mobile home base pad all hookupsdeck and skirting hm1080 sq ft 2 4x4 decks 16 sq ft each, Nov 17, 2025); 12 Olmos Dr (connect mobile home and add two 4x4 decks, Dec 11, 2024); 14 Olmos Dr (move and set new mobile home base pad all hookups deck and skirting hm 990 sq ft 2 4x4 decks 16 sq ft each, Nov 17, 2025).
How do I get alerts for new permits at 7809 Ben White Blvd Svrd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78744- 8 Olmos DrNov 17, 2025Move and set new mobile home base pad all hookupsdeck and skirting hm1080 sq ft 2 4x4 decks 16 sq ft each · 95 m away
- 12 Olmos DrDec 11, 2024Connect mobile home and add two 4x4 decks · 109 m away
- 14 Olmos DrNov 17, 2025Move and set new mobile home base pad all hookups deck and skirting hm 990 sq ft 2 4x4 decks 16 sq ft each · 117 m away
- 7809 E Ben White Blvd Svrd EbOct 22, 2026Installing 114 steel piles to prevent further downward movement at existing hotel · 119 m away
- 31 Olmos DrJun 24, 2026Connect new mobile home with decks (4x4 front & back) · 124 m away
- 9 La Posada DrApr 30, 2026Request for disconnect and reconnect. making repairs to a damaged pedestal only replacing like for like pedestal. neutral bar melted on existing pedestal cannot be repaired. per ec agent: this is a mobile home park with multiple sites that all have their own pedestalbut there is no main shut off. all of the meters are secondarymeters but we have the inability of shutting power off to the meters individually. thisis the reason why we are pulling a permit and requestinga disconnect · 124 m away
- 16 Olmos DrNov 11, 2025New mobile home with skirting and decks (2- 4x4) · 126 m away
- 11 Olmos DrMar 17, 2025Move in and set new mobile home hookups deck and skirting 2 4x4 decks 16 sq ft each =sq ft: 32 · 132 m away
- 18 Olmos DrNov 24, 2025Connect mobile home and 4x4 deck · 135 m away
- 6 Yucca DrDec 31, 2024Connect mobile home add two 4x4 decks · 141 m away
- 8 Yucca DrMar 17, 2025Move in and set up new mobile home/ hookups deck and skirting 2 4x4 decks 16 sq ft each =sq ft: 32 sq ft · 144 m away
- 15 Olmos DrMar 21, 2025Move in and set new mobile home hookups deck and skirting. 2 4x4 decks 16 sq ft each · 148 m away