groundranger
Recent · latest filing Jul 2025Residential

7809 Nunsland Dr

Austin, TX 78744

7809 Nunsland Dr: 1 project on record

City of Austin lists 1 filing across 1 project at 7809 Nunsland Dr, Austin, TX 78744. The most recent, filed July 3, 2025, covers: “Replacement of an existing water heater change out: install/ replace 50 gallon electric tank-type water heater”.

Compiled from City of Austin records · updated Jul 3, 2025

Projects
1
1 filings
Latest filing
Jul 3, 2025
since Jul 3, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Replacement of an existing water heater change out: install/ replace 50 gallon electric tank-type water heater

  1. AppliedJul 2, 2025
  2. IssuedJul 3, 2025
  3. WorkJul '25 – Jul '25
  4. Final inspectionJul 9, 2025

Passed final inspection Jul 9, 2025.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Replacement of an existing water heater change out: install/ replace 50 gallon electric tank-type water heater

    Replacement of an existing water heater change out: install/ replace 50 gallon electric tank-type water heater

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 7809 Nunsland Dr

What is being built at 7809 Nunsland Dr?

The latest filing (City of Austin permit 2025-082491 PP, July 3, 2025) covers replacement of an existing water heater change out: install/ replace 50 gallon electric tank-type water heater.

How many permits and filings does 7809 Nunsland Dr have?

1 filing across 1 project, from July 3, 2025 to July 3, 2025.

Is there other construction near 7809 Nunsland Dr?

Yes. Nearby filings include 7609 Groundhog Way (replacement of complete existing central heat and air system with or without duct work **kat sparks: replace existing 3-ton vertical gas hvac system with new like-for-like 3-ton vertical gas unit. no structural change, Jun 10, 2026); 7813 Peccary Dr (level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <5 feet new 34 emt conduit to power the level 2 ev charger at 48amp constant draw, Mar 24, 2025); 7513 Groundhog Way (replacement of an existing water heater replace 50gal electric water heater, May 15, 2025).

How do I get alerts for new permits at 7809 Nunsland Dr?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78744
Email me when a new permit is filed