8009 Beacon Knob Way
Austin, TX 78744
Central heat and air system replacement at 8009 Beacon Knob Way
A like-for-like replacement of the existing central heat and air system was permitted at 8009 Beacon Knob Way on August 4, 2026. Austin permit 2026-096149 MP describes a 3-ton horizontal gas system, with or without duct work. The permit status is Final.
Summarized from City of Austin records · updated Aug 4, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 4, 2026
- since Aug 4, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work like for like: 3 ton horizontal gas
- AppliedJul 24, 2026
- IssuedAug 4, 2026
- WorkAug '26 – Nov '26
- Final inspectionNov 12, 2026
Passed final inspection Nov 12, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work like for like: 3 ton horizontal gas
Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton horizontal gas
City of Austin permitMechanical PermitFinal- Record
- 2026-096149 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8009 Beacon Knob Way
What work is permitted at 8009 Beacon Knob Way?
A City of Austin mechanical permit covers a like-for-like replacement of the existing central heat and air system.
When was the HVAC permit filed?
The permit was filed on August 4, 2026.
What is the permit number for 8009 Beacon Knob Way?
The permit number is 2026-096149 MP.
What kind of heating and cooling system is being replaced?
The permit describes a 3-ton horizontal gas system, with or without duct work.
Is this a new building at 8009 Beacon Knob Way?
The permit describes replacement of an existing system, not construction of a new building.
What is the status of the permit?
The City of Austin permit is listed as Final.
Also being built nearby
All of 78744- 8017 Beacon Knob WayOct 23, 2026New pool 70 sq ft · 31 m away
- 8000 Beacon Knob WayJan 25, 2025New 12x14 pool with autofill ng heater 17x13 (221 sq ft) wood deck · 55 m away
- 7924 Beacon Knob WayJul 29, 2026New in-ground pool with coping equipment pad and required enclosure · 61 m away
- 8013-1/2 William Cannon DrAug 14, 2025Easton park section 3a phase 1 construction plans · 133 m away
- 8001 William Cannon DrMay 9, 2023Collins phase 1 preliminary plan · 155 m away
- 7921-1/2 William Cannon DrJun 26, 2019William cannon drive phase 2 utility adjustment · 159 m away
- 7918-1/2 William Cannon DrFeb 13, 2020Cottonmouth creek wastewater interceptor phase 2 · 198 m away
- 7328 Lombard LnDec 2, 2025Install energy storage system on an existing single family residence. bluebonnet · 206 m away
- 7316 Lombard LnMay 9, 2024Custom in-ground concrete pool with a 5 deep end measuring 13x26 with a 8x10 l-shape. an in-set tanning ledge will measure 5x10 with angled stairs per plan. pool includes patented pipe-less filtration system engineered wall structure leakproof touch membrane pump and filter. #2 color microbrite led lights and concrete cantilever coping around the perimeter. 310 s.f. of brushed concrete pool decking will surround pool per plan · 208 m away
- 8108 Springsteen DrApr 24, 2025New two-story condo sfr (2br/2.5ba) with attached garage and covered porch *production builder- condo/green building · 253 m away
- 8106 Springsteen DrApr 17, 2025New two-story condo sfr (3br/3ba) with attached garage and covered porch patio and balcony *production builder- condo/green building · 254 m away
- 8104 Springsteen DrJun 9, 2025New two-story condo sfr (2br/2.5ba) with attached garage and covered porch *production builder- condo/green building · 254 m away