groundranger
Recent · latest filing Jul 2026Residential

8400 Skytex St

Austin, TX 78744

Level 2 EV charger permitted at 8400 Skytex St

A Level 2 EV charger is being installed at 8400 Skytex St in Austin. The City of Austin electrical permit was filed July 13, 2026, and is marked final.

Summarized from City of Austin records · updated Jul 13, 2026

Projects
1
1 filings
Latest filing
Jul 13, 2026
since Jul 13, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <5 feet new 3/4 emt conduit to power the level 2 ev charger at 48amp constant draw

  1. AppliedJul 7, 2026
  2. IssuedJul 13, 2026
  3. WorkJul '26 – Sep '26
  4. Final inspectionSep 14, 2026

Passed final inspection Sep 14, 2026.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <5 feet new 3/4 emt conduit to power the level 2 ev charger at 48amp constant draw

    Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <5 feet new 3/4 emt conduit to power the level 2 ev charger at 48amp constant draw

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 8400 Skytex St

What is being installed at 8400 Skytex St?

A Level 2 electric vehicle charger is being installed, according to City of Austin permit 2026-087220 EP.

When was the EV charger permit filed?

The City of Austin filed permit 2026-087220 EP on July 13, 2026.

What is the permit number for the work at 8400 Skytex St?

The electrical permit number is 2026-087220 EP, filed with the City of Austin on July 13, 2026.

What electrical work does the permit describe?

It describes a Level 2 EV charger supplied by a 60-amp circuit breaker, with a stated 48-amp continuous draw and less than five feet of new conduit.

Is the permit for the EV charger at 8400 Skytex St final?

Yes. City of Austin permit 2026-087220 EP is marked final.

Email me when a new permit is filed