Wastewater interceptor phase approved at 8800-1/2 Finial Dr
City of Austin records indicate plans for North Fork Wastewater Interceptor, Segment 4 - Phase 1 at 8800-1/2 Finial Dr. The site-plan case was filed October 25, 2024, and is listed as approved and released. A separate Easton Park Section 5A project assessment filed September 11, 2024, is listed as expired.
Summarized from City of Austin records · updated Oct 25, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Oct 25, 2024
- since Sep 11, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Austin
Questions about 8800-1/2 Finial Dr
What is being built at 8800-1/2 Finial Dr?
City records list North Fork Wastewater Interceptor, Segment 4 - Phase 1. Its site-plan case, 12669438, was filed October 25, 2024, and is marked approved and released.
What is the North Fork Wastewater Interceptor project?
The City of Austin case describes it as North Fork Wastewater Interceptor, Segment 4 - Phase 1. The record does not provide further project details.
Has the wastewater interceptor project been approved?
The site-plan case, 12669438, is listed as approved and released. It was filed on October 25, 2024.
When will construction start at 8800-1/2 Finial Dr?
The available City of Austin records do not give a construction start date.
How much will the project at 8800-1/2 Finial Dr cost?
The records provided do not list a project cost or valuation.
What is the Easton Park Section 5A project assessment at this address?
City case 12741508 is an Easton Park Section 5A project assessment filed September 11, 2024. Its status is listed as expired.
Also being built nearby
All of 78744- 1057 Brickell LoopSep 30, 2025Irrigation install · 30 m away
- 8813-1/2 Finial DrMar 17, 2024Easton park 4d preliminary plan · 86 m away
- 1048 Brickell LoopSep 22, 2025Irrigation install · 88 m away
- 1044 Brickell LoopNov 14, 2024Irrigation install · 125 m away
- 1015 Lucinda Williams DrJul 13, 2026Irrigation install · 130 m away
- 1042 Brickell LoopNov 14, 2024Irrigation install · 135 m away
- 1017 Lucinda Williams DrAug 13, 2025Irrigation install · 139 m away
- 1040 Brickell LoopFeb 20, 2025Irrigation install · 144 m away
- 1014 Lucinda Williams DrSep 22, 2025Irrigation install · 146 m away
- 1019 Lucinda Williams DrJun 10, 2025Irrigation install · 147 m away
- 1038 Brickell LoopOct 11, 2024Irrigation install · 154 m away
- 1016 Lucinda Williams DrSep 24, 2025Irrigation install · 154 m away