8807 Bestride Bnd
Austin, TX 78744
EV charging circuit permitted at 8807 Bestride Bnd
An electrical permit was filed on May 15, 2026, for installation of a circuit for an electric vehicle charging station at 8807 Bestride Bnd. The City of Austin record lists the permit as Final.
Summarized from City of Austin records · updated May 15, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 15, 2026
- since May 15, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled(sepulveda joe treehouse) - installation of circuit for elec. vehicle charging station - esip
- AppliedMay 13, 2026
- IssuedMay 15, 2026
- WorkMay '26 – Nov '26
- Final inspectionMay 18, 2026
Passed final inspection May 18, 2026.
1 contact on this project
Permit & project history
1 project(sepulveda joe treehouse) - installation of circuit for elec. vehicle charging station - esip
(sepulveda joe treehouse) - installation of circuit for elec. vehicle charging station - esip
City of Austin permitElectrical PermitFinal- Record
- 2026-060014 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8807 Bestride Bnd
What is being built at 8807 Bestride Bnd?
A City of Austin electrical permit describes installation of a circuit for an electric vehicle charging station. It does not describe a new building.
When was the EV charging circuit permitted at 8807 Bestride Bnd?
The permit was filed on May 15, 2026.
What is the permit number for 8807 Bestride Bnd?
The permit number is 2026-060014 EP.
Is an electric vehicle charging station being installed at this address?
The permit description is for installation of a circuit for an electric vehicle charging station. The record does not provide further details about the station.
What is the status of the permit at 8807 Bestride Bnd?
The City of Austin record lists permit 2026-060014 EP as Final.
Also being built nearby
All of 78744- 7809 Orizzonte StNov 9, 2026Total demolition of pool 508 sq ft circa 2022 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 119 m away
- 8605 Silverthorne StAug 17, 2025Install gas line to existing gas line for generator · 167 m away
- 7909 Gilwice LnDec 5, 2023Install new 27kw energy storage system for existing residential only. this is in addition to an existing solar system. bluebonnet utility · 169 m away
- 8018 Corrigan PassApr 11, 2024Installation of 59 roof mounted solar panels a line side tap will be completed on the existing main service panel. equipment includes 59x hanwha qcell 410 solar edge inverter 11400 solar edge inverter 6000 tesla backup gateway · 180 m away
- 7904 Gilwice LnFeb 28, 2024Replacement of an existing water heater · 181 m away
- 8009 Gilwice LnJun 30, 2025Replacement of an existing water heater 40-50 gal standard use tank water heater change out. 8009 gilwice ln austin tx 78744 · 188 m away
- 8009 Corrigan PassJan 13, 2026New construction in-ground pool with concrete deck · 193 m away
- 8100 Corrigan PassJan 24, 2024Irrigation installation · 219 m away
- 8102 Corrigan PassJan 24, 2024Irrigation installation · 221 m away
- 8104 Corrigan PassJan 18, 2024Irrigation installation · 222 m away
- 8106 Corrigan PassJan 10, 2024Irrigation installation · 223 m away
- 7918 Corrigan PassDec 18, 2025Express- remove and replace 6 windows · 223 m away