1108 Radam Cir
Austin, TX 78745
1108 Radam Cir: 1 project on record
City of Austin lists 1 filing across 1 project at 1108 Radam Cir, Austin, TX 78745. The most recent, filed June 4, 2024, covers: “56 feet of the drain line for house minus 20 feet of pvc that has been previously replaced. additionally 30 feet of pipe spanning main line to kitchen area”.
Compiled from City of Austin records · updated Jun 4, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 4, 2024
- since Jun 4, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled56 feet of the drain line for house minus 20 feet of pvc that has been previously replaced. additionally 30 feet of pipe spanning main line to kitchen area
- AppliedMay 31, 2024
- IssuedJun 4, 2024
- WorkJun '24 – Jun '24
- Final inspectionJun 28, 2024
Passed final inspection Jun 28, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 project56 feet of the drain line for house minus 20 feet of pvc that has been previously replaced. additionally 30 feet of pipe spanning main line to kitchen area
56 feet of the drain line for house minus 20 feet of pvc that has been previously replaced. additionally 30 feet of pipe spanning main line to kitchen area
City of Austin permitPlumbing PermitFinal- Record
- 2024-068449 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1108 Radam Cir
What is being built at 1108 Radam Cir?
The latest filing (City of Austin permit 2024-068449 PP, June 4, 2024) covers 56 feet of the drain line for house minus 20 feet of pvc that has been previously replaced. additionally 30 feet of pipe spanning main line to kitchen area.
How many permits and filings does 1108 Radam Cir have?
1 filing across 1 project, from June 4, 2024 to June 4, 2024.
Is there other construction near 1108 Radam Cir?
Yes. Nearby filings include 5402 Salem Walk Dr (replacement of complete existing central heat and air system with or without duct work, Dec 5, 2025); 5401 Salem Walk Dr (tunnel below the foundation to repair drain lines, Jan 19, 2024); 5219 Meadow Creek Dr (water heater swap out, Feb 23, 2024).
How do I get alerts for new permits at 1108 Radam Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 5402 Salem Walk DrDec 5, 2025Replacement of complete existing central heat and air system with or without duct work · 123 m away
- 5401 Salem Walk DrJan 19, 2024Tunnel below the foundation to repair drain lines · 127 m away
- 5219 Meadow Creek DrFeb 23, 2024Water heater swap out · 131 m away
- 5404 Emerald Forest DrJul 16, 20265 trench to correct slope on the main drain · 135 m away
- 5403 Salem Walk DrJul 14, 2025Upgrading main breaker box and electrical meter base from 100 amp to 200 amp afci gfci breakers update grounding system · 136 m away
- 5404 Salem Walk DrNov 15, 2024Replacement of complete existing central heat and air system with or without duct work · 144 m away
- 5406 Emerald Forest DrAug 26, 2024Full remodel to include structural changes garage conversion and patio conversion for additional living space. exterior modifications to include installation of new windows window placements brick repair and installation of new siding · 146 m away
- 5403 Hunters GlnDec 12, 2023Panel upgrade: remove old service and install a new 200-amp service · 152 m away
- 5400 Jeffburn CvFeb 25, 2025The old water heater needs to be brought up to code · 153 m away
- 1013 Cedar GlnAug 12, 202470 tunnel below the foundation to replace entire cast-iron drain system. two access holes - one front one left · 160 m away
- 5209 Meadow Creek DrDec 5, 2023Replacement of complete existing central heat and air system with or without duct work · 162 m away
- 5405 Hunters GlnMay 22, 2026Slab penetration in garage and 10 tunnel below the foundation to the main drain · 165 m away
More restaurants in 78745.