1201 Arden Dr
Austin, TX 78745
1201 Arden Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 1201 Arden Dr, Austin, TX 78745. The most recent, filed December 12, 2024, covers: “Replacement of an existing water heater”.
Compiled from City of Austin records · updated Dec 12, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Dec 12, 2024
- since Dec 12, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater
- AppliedNov 22, 2024
- IssuedDec 12, 2024
- WorkDec '24 – Feb '25
- Final inspectionFeb 18, 2025
Passed final inspection Feb 18, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2024-155213 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1201 Arden Dr
What is being built at 1201 Arden Dr?
The latest filing (City of Austin permit 2024-155213 PP, December 12, 2024) covers replacement of an existing water heater.
How many permits and filings does 1201 Arden Dr have?
1 filing across 1 project, from December 12, 2024 to December 12, 2024.
Is there other construction near 1201 Arden Dr?
Yes. Nearby filings include 1200 Arden Dr (replacement of complete existing central heat and air system with or without duct work, Aug 7, 2024); 1202 Arden Dr (remove and replace 50 main sewer line. per melissa gunnels: the trench will be hand dug and there are no protected trees. we will only be cutting across the driveway not the foundation to the home, Apr 19, 2024); 1200 Green Forest Dr (new pool/spa with required enclosure and concrete deck (heater or autofill), Dec 26, 2024).
How do I get alerts for new permits at 1201 Arden Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 1200 Arden DrAug 7, 2024Replacement of complete existing central heat and air system with or without duct work · 41 m away
- 1202 Arden DrApr 19, 2024Remove and replace 50 main sewer line. per melissa gunnels: the trench will be hand dug and there are no protected trees. we will only be cutting across the driveway not the foundation to the home · 48 m away
- 1200 Green Forest DrDec 26, 2024New pool/spa with required enclosure and concrete deck (heater or autofill) · 57 m away
- 1204 Arden DrMar 31, 2025Replacement of complete existing central heat and air system with or without duct work · 59 m away
- 4716 Mount Vernon DrMay 17, 2024New construction inground gunite pool with autocover · 63 m away
- 4714 Mount Vernon DrFeb 27, 2025Install new gas line for generator · 64 m away
- 4616 Hank AveJan 17, 2024Express: reroof house · 92 m away
- 4621 Banister LnMay 10, 2026Tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc. there will be three access holds in front back and the side of the house · 100 m away
- 4611 Jinx AveDec 9, 2014Forest oaks, lot 1, block k; resubdivision · 100 m away
- 4719 Mount Vernon DrSep 28, 2026Replacement of complete existing central heat and air system with or without duct work like for like 3 ton 2 stage vertical gas · 109 m away
- 4619 Banister LnNov 10, 2026New construction- new 2 story single family residence with 4 bed 5 bath with rear patio · 114 m away
- 4612 Hank AveAug 27, 2026Water heater replacement in middle closet of home · 114 m away