1911 Parkside Ln
Austin, TX 78745
1911 Parkside Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 1911 Parkside Ln, Austin, TX 78745. The most recent, filed January 7, 2025, covers: “Excavate 4 tunnel to repair drain line serving bathroom”.
Compiled from City of Austin records · updated Jan 7, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jan 7, 2025
- since Jan 7, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExcavate 4 tunnel to repair drain line serving bathroom
- AppliedDec 30, 2024
- IssuedJan 7, 2025
- WorkJan '25 – Jan '25
- Final inspectionJan 24, 2025
Passed final inspection Jan 24, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectExcavate 4 tunnel to repair drain line serving bathroom
Excavate 4 tunnel to repair drain line serving bathroom
City of Austin permitPlumbing PermitFinal- Record
- 2024-167256 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1911 Parkside Ln
What is being built at 1911 Parkside Ln?
The latest filing (City of Austin permit 2024-167256 PP, January 7, 2025) covers excavate 4 tunnel to repair drain line serving bathroom.
How many permits and filings does 1911 Parkside Ln have?
1 filing across 1 project, from January 7, 2025 to January 7, 2025.
Is there other construction near 1911 Parkside Ln?
Yes. Nearby filings include 1907 Parkside Ln (-request to disconnect -permitting and associated fees -contractor disconnect fees -new 200 amp rated meter -new 150 amp mcb load center -new whole house sure protection -new inter-system ground bar -new additional grounding )2x grounding rods ) -new gas ground -new cold water ground, Oct 16, 2025); 1908 Parkside Ln (replacement of an existing water heater exterior tankless water heater, Jan 8, 2026); 1910 Parkside Ln (excavate 55 tunnel to repair main drain line under house excavate 50 trench to repair the drain line in yard, May 6, 2026).
How do I get alerts for new permits at 1911 Parkside Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 1907 Parkside LnOct 16, 2025-request to disconnect -permitting and associated fees -contractor disconnect fees -new 200 amp rated meter -new 150 amp mcb load center -new whole house sure protection -new inter-system ground bar -new additional grounding )2x grounding rods ) -new gas ground -new cold water ground · 38 m away
- 1908 Parkside LnJan 8, 2026Replacement of an existing water heater exterior tankless water heater · 46 m away
- 1910 Parkside LnMay 6, 2026Excavate 55 tunnel to repair main drain line under house excavate 50 trench to repair the drain line in yard · 50 m away
- 1912 Cannonwood LnFeb 15, 2024Installation of pv panels on existing residential roof · 51 m away
- 1906 Parkside LnApr 2, 2026Tunnel 80 to replace all cast iron drains. access holes at the front of the home back left and right side of the home · 52 m away
- 1912 Parkside LnJul 29, 2026Replace sewer line 36 ft replace sewer line (old cast iron 65ft) tunnel. 2 bath kitchen and laundry by tunnel replace water heater in existing space · 61 m away
- 1904 Parkside LnSep 30, 2026Sewer line repair · 65 m away
- 1914 Cannonwood LnAug 2, 2024Replacement of mini-split system · 66 m away
- 1918 Cannonwood LnJul 7, 2025Upgrade: take out existing 200 amp. overhead electrical service that has no main breaker and no 2 rigid overhead riser. install new 200amp. electrical service install new meter new main breaker panel new 2 rigid overhead riser · 92 m away
- 1900 Parkside LnNov 16, 2023Express: replace windows like for like · 107 m away
- 1909 Cannonwood LnAug 20, 2025Emergency repair service rebuild due to austin energy shutting off service because of cloth riser shorting out. also replacing subpanel because zinco-type panel · 110 m away
- 1919 Cannonwood LnFeb 9, 2024Tunnel under foundation to replace drain line for kitchen and washer to pvc · 116 m away