groundranger
Historic · latest filing Jul 2024Residential

209 Chippendale Ave

Austin, TX 78745

209 Chippendale Ave: 2 projects on record

City of Austin lists 2 filings across 2 projects at 209 Chippendale Ave, Austin, TX 78745 since November 29, 2023. The most recent, filed July 16, 2024, covers: “Express: replace existing windows”.

Compiled from City of Austin records · updated Jul 16, 2024

Projects
2
2 filings
Latest filing
Jul 16, 2024
since Nov 29, 2023
Largest scope
—
Listed value
—

Where this project stands

Finaled

Express: replace existing windows

  1. AppliedMar 30, 2023
  2. IssuedJul 16, 2024
  3. WorkJul '24 – Jul '24
  4. Final inspectionJul 17, 2024

Passed final inspection Jul 17, 2024.

2 contacts on this project · 2 phone numbers

Permit & project history

2 projects
  1. Express: replace existing windows

    Express: replace existing windows

    City of Austin permitBuilding PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replacement of an existing tank water heater with a tankless water heater

    Replacement of an existing tank water heater with a tankless water heater

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 209 Chippendale Ave

What is being built at 209 Chippendale Ave?

The latest filing (City of Austin permit 2023-038480 BP, July 16, 2024) covers express: replace existing windows.

How many permits and filings does 209 Chippendale Ave have?

2 filings across 2 projects, from November 29, 2023 to July 16, 2024.

Is there other construction near 209 Chippendale Ave?

Yes. Nearby filings include 203 Winchester Ct (5 trench tor repair yard sewer and 3 tunnel below the foundation to repair break just upstream of clean out on sewer main. access hole on left, Oct 3, 2025); 301 Rowland Dr (replacement of complete existing central heat and air system with or without duct work change out like for like with duct work 1 gas unit, Apr 8, 2025); 205 Winchester Ct (we will be tunneling 10 ft under the slab to make repairs to the drain line as well as excavating 40ft in the yard to replace the sewer line, Feb 26, 2026).

How do I get alerts for new permits at 209 Chippendale Ave?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78745
Email me when a new permit is filed