211 Chaparral Rd
Austin, TX 78745 · Justin Poses
Paloma subdivision case at 211 Chaparral Road
City of Austin records show a Paloma subdivision case at 211 Chaparral Road. A case filed August 14, 2026, is marked Approved; a later filing on November 13, 2026, is marked CC Pending. An earlier case filed January 5, 2026, was withdrawn.
Summarized from City of Austin records · updated Nov 18, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Nov 18, 2026
- since Nov 18, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Austin
Questions about 211 Chaparral Rd
What is being built at 211 Chaparral Road in Austin?
City records list a Paloma subdivision case at the address. The records do not specify the number of lots or buildings.
What is the status of the Paloma subdivision at 211 Chaparral Road?
A City of Austin case filed November 13, 2026, is marked CC Pending. A related case filed August 14, 2026, is marked Approved.
When was the Paloma subdivision case filed?
City records list filings dated January 5, August 14, and November 13, 2026. The January filing was withdrawn, the August case was approved, and the November case is marked CC Pending.
Has construction started at 211 Chaparral Road?
The records provided list subdivision cases, not construction activity at this address, so they do not establish whether construction has started.
How many homes or lots are planned for the Paloma subdivision?
The available City of Austin records do not specify a lot or home count.
Also being built nearby
All of 78745- 210 Chaparral RdDec 10, 2024Express: foundation repair · 53 m away
- 208 Chaparral RdNov 10, 2026Base: installing a backup battery system and additional meter socket · 63 m away
- 302 Chaparral RdNov 10, 2026Resubdivision of lot 9 and a portion of lot 10 block b circle "s" ridge (with r c8-2025-0001.0a) · 66 m away
- 202 Chaparral RdSep 11, 2024Replacement of ex. 4 cast iron pipe with 4 pvc sanitary waste inside the building ~35lf. concrete will be cut to expose the ww line and a replacement will be performed. *** 15ft of driveway and 30ft of foundation · 80 m away
- 7001 Circle S RdMar 1, 2024Resubdivision of lot 1 tamayo subdivision · 81 m away
- 200 Chaparral RdSep 11, 2024Replacement of ex. 4 cast iron pipe with 4 pvc sanitary waste inside the building ~35lf. concrete will be cut to expose the ww line and a replacement will be performed. *** 15ft of driveway and 30ft of foundation · 92 m away
- 7007 Circle S RdMar 25, 2025Paloma subdivision · 98 m away
- 6909 Circle S RdSep 11, 2024Replacement of ex. 4 cast iron pipe with 4 pvc sanitary waste inside the building ~35lf. concrete will be cut to expose the ww line and a replacement will be performed. *** 15ft of driveway and 30ft of foundation · 101 m away
- 401 Chaparral RdOct 13, 2026Like for like panel swap with no meter work · 103 m away
- 6907 Circle S RdSep 2, 2025Replacement of complete existing central heat and air system with or without duct work · 110 m away
- 7006 Circle S RdApr 2, 2026New construction of sfr mobile home. the carports shown on the plans were removed from the scope of work at the applicants request. addition of the carports will require a revision or a new separate permit application · 146 m away
- 7103 Circle S RdAug 26, 2024Home energy savings job with austin energy with a/c and duct replacement · 149 m away